Inspection Detail
Inspection: 123158628 - Concavage Marine Construction Co.
Inspection Information - Office: Bridgeport Area Office
Site Address:
Concavage Marine Construction Co.
Long Island Sound, Near Buoy #26
Westport, CT 06830
Mailing Address:
87 Fox Island Road, Port Chester, NY 10573
Union Status: NonUnion
SIC:1629
NAICS: 236210/Industrial Building Construction
Inspection Type: Referral
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 02/14/2005
Emphasis:
Case Closed: 03/13/2006
Type | Activity Nr | Safety | Health |
---|---|---|---|
Referral | 201528759 | Yes | |
Accident | 101520575 |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 11 | 1 | 12 | |||
Current Violations | 11 | 1 | 12 | |||
Initial Penalty | $11,800 | $0 | $0 | $0 | $0 | $11,800 |
Current Penalty | $10,000 | $0 | $0 | $0 | $0 | $10,000 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001A | Serious | 19101200 E01 | 02/28/2005 | 04/02/2005 | $383 | $450 | $0 | I - Informal Settlement | ||
2. | 01001B | Serious | 19101200 F05 I | 02/28/2005 | 03/08/2005 | $0 | $0 | $0 | I - Informal Settlement | ||
3. | 01001C | Serious | 19101200 G01 | 02/28/2005 | 04/02/2005 | $0 | $0 | $0 | I - Informal Settlement | ||
4. | 01002 | Serious | 19101200 H | 02/28/2005 | 04/02/2005 | $383 | $450 | $0 | I - Informal Settlement | ||
5. | 01003 | Serious | 19260251 B06 I | 02/28/2005 | 04/02/2005 | $383 | $450 | $0 | I - Informal Settlement | ||
6. | 01004A | Serious | 19260300 B07 | 02/28/2005 | 03/08/2005 | $638 | $750 | $0 | I - Informal Settlement | ||
7. | 01004B | Serious | 19260303 C02 | 02/28/2005 | 03/08/2005 | $0 | $0 | $0 | I - Informal Settlement | ||
8. | 01005 | Serious | 19260350 J | 02/28/2005 | 03/08/2005 | $638 | $750 | $0 | I - Informal Settlement | ||
9. | 01006A | Serious | 19260550 A05 | 02/28/2005 | 04/02/2005 | $893 | $1,050 | $0 | I - Informal Settlement | ||
10. | 01006B | Serious | 19260550 A06 | 02/28/2005 | 04/22/2005 | $0 | $0 | $0 | P - Petition to Mod Abatement | ||
11. | 01007A | Serious | 19260550 F01 II | 02/28/2005 | 03/08/2005 | $893 | $1,050 | $0 | I - Informal Settlement | ||
12. | 01007B | Serious | 19260550 F01 IV | 02/28/2005 | 03/08/2005 | $0 | $0 | $0 | I - Informal Settlement | ||
13. | 01008 | Serious | 19260605 C02 | 02/28/2005 | 04/02/2005 | $1,275 | $1,500 | $0 | I - Informal Settlement | ||
14. | 01009 | Serious | 19260605 C03 | 02/28/2005 | 03/08/2005 | $1,275 | $1,500 | $0 | I - Informal Settlement | ||
15. | 01010 | Serious | 19260605 D03 | 02/28/2005 | 03/04/2005 | $2,350 | $2,800 | $0 | I - Informal Settlement | ||
16. | 01011 | Serious | 19261052 C01 | 02/28/2005 | 04/02/2005 | $893 | $1,050 | $0 | I - Informal Settlement | ||
17. | 02001 | Other | 19100134 B06 | 02/28/2005 | 03/04/2005 | $0 | $0 | $0 | I - Informal Settlement |
Investigation Summary
On October 14, 2004, Employee #1 was standing on the edge of a spud barge, measuring 35- feet long, attempting to secure a wooden spud in place. The barge had been in use for approximately three months and was loaded with construction materials, leaving little surface area for walking and working. Additionally, the weather was inclement and Employee #1 was not wearing a personal floatation device. As Employee #1 was securing the spud, he fell overboard and drowned.
Keywords: BARGE, PPE, CONSTRUCTION, FALL, SLIPPERY SURFACE, DROWN, WORK SURFACE, WATER
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 123158628 | Fatality | Other | Occupation not reported |