Inspection Type: Referral

Scope: Partial

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 12/19/1996

Emphasis:

Case Closed: 06/10/1997


Related Activity
Type Activity Nr Safety Health
Referral 200120210 Yes
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 2 2
Current Violations 1 1
Initial Penalty $1,750 $0 $0 $0 $0 $1,750
Current Penalty $500 $0 $0 $0 $0 $500
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citation Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Serious 19260021 B02 01/03/1997 01/21/1997 $500 $875 $0 01/28/1997 F - Formal Settlement  
2. 01002 Serious 19260416 A01 01/03/1997 01/21/1997 $875 $875 $0 01/28/1997 F - Formal Settlement Citation has been deleted.

Investigation Summary

Investigation Nr: 200120087
Event: 10/29/1996
BURN - ELECTRICAL FAULT IN BUSWAY

Two journeyman electricians and an apprentice were installing a 400-ampere bus-plug circuit breaker onto a 4000-ampere Square D busway. The busway was installed at a height of about 3.7 meters above a new area of a plant to serve a new engine block line that was being installed at the time. A disconnect was located about 18.3 meters away, but the employees did not deenergize the circuit for fear of deenergizing other equipment in use at the time. However, there was no record that the employees made any inquiry about deenergizing the circuit. Similar requests had reportedly been summarily turned down without an evaluation of the available options. Two of the three employees were on a scissor lift, and the other one was atop the busway itself. They were trying to adjust the vertical position of the plug, which was slightly high at one end. The problem developed because the electricians had removed the insulating dead front at the plug entrance opening. (They had earlier been installing larger plugs, for which the installation method was different and required removal of that insulator.) When the employees lifted the bus plug enclosure up and away from the busway, the clamps that secured the plug to the individual busbars faulted across two phases, causing an electric arc and an ensuing fire. The employee on the busway suffered burns. He also shattered his tibia when he jumped from the busway to escape the flames. The other two employees suffered less severe burns, though one of them needed repeated medical treatment. All three employees were hospitalized for their injuries.

Keywords: BURN, ELECTRIC ARC, FRACTURE, E GI IV, ELECTRICAL, ELECTRICIAN, BUSBAR, ELECTRICAL WORK, LOCKOUT, ELECTRICAL FAULT

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 122209992 Hospitalized injury Burn/Scald(Heat) Electricians
2 122209992 Hospitalized injury Burn/Scald(Heat) Electricians
3 122209992 Hospitalized injury Burn/Scald(Heat) Electricians
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close