Inspection Detail
Inspection: 1220002.015 - Frito-Lay, Inc.
Inspection Information - Office: Bakersfield District Office
Site Address:
Frito-Lay, Inc.
28801 Hwy 58
Bakersfield, CA 93314
Mailing Address:
28801 Hwy 58, Bakersfield, CA 93314
Union Status: NonUnion
SIC:
NAICS: 311919/Other Snack Food Manufacturing
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 07/25/2017
Emphasis:
Case Closed: 11/13/2017
Type | Activity Nr | Safety | Health |
---|---|---|---|
Accident | 1193381 |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 3 | 3 | ||||
Current Violations | 1 | 1 | 2 | |||
Initial Penalty | $54,000 | $0 | $0 | $0 | $0 | $54,000 |
Current Penalty | $18,000 | $0 | $0 | $10,000 | $0 | $28,000 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Other | 3203(A)(7)(E) | 07/25/2017 | 08/04/2017 | $10,000 | $18,000 | $0 | 09/19/2017 | F - Formal Settlement | |
2. | 02001 | Serious | 3328(G) | 07/25/2017 | $18,000 | $18,000 | $0 | 09/19/2017 | F - Formal Settlement | ||
3. | 03001 | Serious | 3383(A) | 07/25/2017 | 08/04/2017 | $0 | $18,000 | $0 | 09/19/2017 | F - Formal Settlement | Citation has been deleted. |
Investigation Summary
At 10:30 a.m. on March 19, 2017, Employee #1 was working for a manufacturer of snack foods. He was the group leader in a group of three sanitation workers. He and his two coworkers were performing the sanitation procedure on a potato chip fryer (PC fryer) that was part of a potato chip processing line. During the sanitation procedure, the system had to go through a boil-out process. To start, the employees drained the oil from the system and added a cleaning solution of a hot caustic cleaner and water. The caustic cleaner was HD Plusfoam VF1 and Resource. It contained sodium hydroxide. The system was controlled through a computer system that should have automatically set the required temperature of 88 degrees Celsius (190 degrees Fahrenheit) for the boil-out process. The temperature was maintained in the heat exchanger system by allowing steam through an automated control valve. This valve was a Fisher Type 667 diaphragm actuator, with Serial Number 12042066. The valve was not isolating correctly. It had to be opened manually by the maintenance department. The boil out process took approximately 3 to 4 hours. About 1 hour into the boil-out process, the workers noticed that the temperature was fluctuating above 93 degrees Celsius (200 degrees Fahrenheit), as displayed on a computer screen. When the first coworker saw that the temperature was getting up to 110 degrees Celsius (230 degrees Fahrenheit), he attempted to shut everything off in an attempt to lower the temperature. He noticed that the boil-out system had lost about half of the water that was circulating through it due to boiling off and overflowing. He observed that a lot of steam was coming out from the PC fryer. Employee #1 was walking by, when his two coworkers informed him that the boil-out process was getting too hot. Employee #1 and the first coworker went on a platform on the north side of the PC fryer to check the computer screen for the system. At about 10:20 a.m., steam pressure from the excessive heat in the system caused a panel for the fryer fines removal system to blow open. The fryer fines removal system was on the south side of the PC fryer. The hot water and chemical mixture blew out and flew over the PC fryer. The mixture landed on Employee #1 and the first coworker. They had stepped off the platform when they had heard the noise of the incipient eruption. They were only about a meter, or a couple of feet, from the fryer, when they were splashed. The first coworker had personal protective equipment that included a raincoat that mostly protected her from the hot cleaning solution. Employee #1 was not wearing any personal protective equipment. He was burned by the hot liquid on his back. He sustained second and third degree burns to his scalp, neck, posterior torso, and upper extremities on his left hand side. He was hospitalized.
Keywords: Burn, Caustic, Chemical, Chemical Burn, Cleaning, Fryer, Heat Exchanger, High Pressure, High Temperature, Mech Malfunction, PPE, Pressure Piping, Pressure Release, Sodium Hydroxide
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 1220002.015 | 49 | M | Hospitalized injury | Laborers, except construction |