Inspection Detail

Case Status: CLOSED

Inspection: 1217842.015 - Badger Magnetics, Inc.

Inspection Information - Office: Milwaukee

 

Inspection Nr: 1217842.015
Report ID: 0523400
Open Date: 03/14/2017

Site Address:
Badger Magnetics, Inc.
7939 West Tower Avenue
Milwaukee, WI 53223

Mailing Address:
7939 West Tower Avenue, Milwaukee, WI 53223

Union Status: NonUnion

SIC:

NAICS: 334416/ Electronic Coil, Transformer, and Other Inductor Manufacturing


Inspection Type: Referral

Scope: Partial

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 03/14/2017

Emphasis:

Close Case:05/16/2018


Related Activity
Type Activity Nr Safety Health
Referral 1189027 Yes
Inspection 1219419 Yes
Case Status: CLOSED
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 5 3 8
Current Violations 2 5 7
Initial Penalty $34,584 $0 $0 $6,338 $0 $40,922
Current Penalty $8,000 $0 $0 $4,500 $0 $12,500
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001A Other 19100147 C01 07/28/2017 03/19/2018 $1,000 $3,802 $0 08/22/2017 F - Formal Settlement  
2. 01001B Serious 19100147 C04 I 07/28/2017 08/23/2017 $0 $0 $0 08/22/2017 F - Formal Settlement Citation has been deleted.
3. 01001C Other 19100147 C07 I 07/28/2017 03/19/2018 $0 $0 $0 08/22/2017 F - Formal Settlement  
4. 01002 Other 19100178 L01 II 07/28/2017 08/03/2017 $1,000 $5,432 $0 08/22/2017 F - Formal Settlement  
5. 01003 Serious 19100179 J01 II 07/28/2017 09/14/2017 $2,500 $3,802 $0 08/22/2017 F - Formal Settlement  
6. 01004A Other 19100219 D01 07/28/2017 08/23/2017 $0 $3,802 $0 08/22/2017 F - Formal Settlement  
7. 01004B Serious 19100212 A01 07/28/2017 08/23/2017 $0 $0 $0 08/22/2017 F - Formal Settlement Citation has been deleted.
8. 01005A Serious 19100333 A 07/28/2017 03/19/2018 $5,500 $8,873 $0 08/22/2017 F - Formal Settlement  
9. 01005B Serious 19100333 B02 I 07/28/2017 03/19/2018 $0 $0 $0 08/22/2017 F - Formal Settlement  
10. 01005C Serious 19100333 C02 07/28/2017 03/19/2018 $0 $8,873 $0 08/22/2017 F - Formal Settlement  
11. 02001 Other 19040039 A02 07/28/2017 03/19/2018 $2,500 $6,338 $0 08/22/2017 F - Formal Settlement  
12. 02002 Other 19100132 D02 07/28/2017 08/03/2017 $0 $0 $0 08/22/2017 F - Formal Settlement Citation has been deleted.
13. 02003 Other 19100179 G01 V 07/28/2017 03/19/2018 $0 $0 $0 08/22/2017 F - Formal Settlement  

Investigation Summary

Investigation Nr: 93954.015
Event: 02/21/2017
Employee Testing Transformers Receives Electrical Shock

At approximately 11:00 a.m. on February 21, 2017, Employee #1 was testing electr ical transformers and received an electrical shock. Employee #1 was hospitalize d.

Keywords:electrical, ppe, shock

Investigated Inspection
# Inspection Age Sex Degree Nature Occupation
1 1217842.015 Hospitalized injury
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.