Inspection Detail
Inspection: 1217118.015 - Trinity Valley Construction, Inc.
Inspection Information - Office: Fremont District Office
Site Address:
Trinity Valley Construction, Inc.
228 Esfahan Dr.
San Jose, CA 95111
Mailing Address:
5737 Fulkerth Rd, Turlock, CA 95380
Union Status: NonUnion
SIC:
NAICS: 238130/Framing Contractors
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 08/28/2017
Emphasis: S:Permit
Case Closed: 07/27/2020
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 1190384 | ||
| Inspection | 1217140 | Yes | |
| Inspection | 1217151 | Yes |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 2 | 1 | 3 | |||
| Current Violations | 2 | 1 | 3 | |||
| Initial Penalty | $25,200 | $0 | $0 | $800 | $0 | $26,000 |
| Current Penalty | $22,385 | $0 | $0 | $485 | $0 | $22,870 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Other | 1509(A) | 08/29/2017 | $485 | $800 | $0 | 09/11/2017 | F - Formal Settlement | ||
| 2. | 02001 | Serious | 1610(A) | 08/29/2017 | $4,385 | $7,200 | $0 | 09/11/2017 | F - Formal Settlement | ||
| 3. | 03001 | Serious | 1670(A) | 08/29/2017 | $18,000 | $18,000 | $0 | 09/11/2017 | F - Formal Settlement |
Investigation Summary
At 1:15 p.m. on March 9, 2017, an employee was helping set roof trusses packs onto the roof structure. The employee fell while performing signaling operation for crane operation and was injured.
Keywords: Crane, Fall Protection, Falling Object, Roof, Truss
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 1217118.015 | 31 | M | Hospitalized injury | Laborers, except construction |
Translate