Inspection Detail
Inspection: 120184676 - Ist Mechanical Corp.
Inspection Information - Office: American Canyon District Office
Site Address:
Ist Mechanical Corp.
Pacific Refinery, 4901 San Pablo Avenue
Hercules, CA 94547
Mailing Address:
1070 E. 233rd Street, Carson, CA 90745
Union Status: NonUnion
SIC:1711
NAICS: 0
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 01/14/1994
Planning Guide: Safety-Construction
Emphasis:
Case Closed: 02/25/1994
Type | Activity Nr | Safety | Health |
---|---|---|---|
Accident | 362106866 |
Investigation Summary
Employee #1 caught his hand between a heat exchanger tube bundle and a flange as he was instructing a coworker in the hazards of a pinch point. He lost three fingers from his right hand. He was out of sight of another employee pulling a tube bundle during turnaround in an oil refinery.
Keywords: AMPUTATED, FINGER, WORK RULES, CONSTRUCTION, CAUGHT BETWEEN, HEAT EXCHANGER, REFINERY, INATTENTION
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 120184676 | Hospitalized injury | Amputation | Boilermakers | ||
2 | 120184676 | Non Hospitalized injury | Cut/Laceration | Boilermakers |