Inspection Detail
Inspection: 119690337 - Shelton Roofing
Inspection Information - Office: Fremont District Office
Site Address:
Shelton Roofing
1091 Shoreline Blvd
Mountain View, CA 94043
Mailing Address:
1988 Leghorn Street, Mountain View, CA 94043
Union Status: Union
SIC:1761
NAICS: 0
Inspection Type: Accident
Scope: Complete
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 11/14/2001
Emphasis: S:Construction (Cship)
Case Closed: 02/05/2002
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 102341476 |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 4 | 4 | ||||
| Current Violations | 4 | 4 | ||||
| Initial Penalty | $0 | $0 | $0 | $1,275 | $0 | $1,275 |
| Current Penalty | $0 | $0 | $0 | $1,275 | $0 | $1,275 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Other | 14305 C | 12/11/2001 | 12/28/2001 | $300 | $300 | $0 | - | ||
| 2. | 01002 | Other | 5194 E01 | 12/11/2001 | 12/28/2001 | $450 | $450 | $0 | - | ||
| 3. | 01003 | Other | 1509 A | 12/11/2001 | 12/28/2001 | $300 | $300 | $0 | - | ||
| 4. | 01004 | Other | 1510 C | 12/11/2001 | 12/28/2001 | $225 | $225 | $0 | - |
Investigation Summary
On June 27, 2001, Employee #1 and two coworkers were removing, cleaning, preparing, and sealing with hot asphalt the skylights at a shopping center. Employee #1 was on the ground attending the recirculation valve on a kettle of hot asphalt and a 20 ft long pipe that was to deliver the hot asphalt to the roof. He was also assigned to keep pedestrians away from the setup. After the kettle was ignited and the thermostat set between 450 and 500 degrees F, a coworker on the roof pulled on a rope attached to the recirculation valve lever to start the hot asphalt pumping through the pipe. Employee #1 was standing approximately 24 in. to 36 in. from the kettle when the gasket failed on the recirculation valve and he was sprayed by hot asphalt. He sustained burns, for which he was hospitalized.
Keywords: BURN, ROOF, GASKET, CONSTRUCTION, EQUIPMENT FAILURE, HOT ASPHALT, VALVE, ACCIDENTAL DISCHARGE, HIGH TEMPERATURE
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 119690337 | Hospitalized injury | Burn(Chemical) | Construction laborers |
Translate