Inspection Detail
Note: The following inspection has not been indicated as closed. Please be aware that the information shown may change, e.g. violations may be added or deleted. For open cases, in which a citation has been issued, the citation information may not be available for 5 days following receipt by the employer for Federal inspections or for 30 days following receipt by the employer for State inspections.
Inspection: 1186266.015 - Atlantic Drain Service Company, Inc.
Inspection Information - Office: Boston South
Site Address:
Atlantic Drain Service Company, Inc.
10 - 12 Dartmouth Street
Boston, MA 02116
Mailing Address:
200 Center Street, Bellingham, MA 02019
Union Status: NonUnion
SIC:
NAICS: 237110/Water and Sewer Line and Related Structures Construction
Inspection Type: Fat/Cat
Scope: Complete
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 10/21/2016
Emphasis: N:Svep, N:Trench
Case Closed:
Type | Activity Nr | Safety | Health |
---|---|---|---|
Accident | 1153854 | ||
Inspection | 1193296 | Yes |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 4 | 10 | 3 | 1 | 18 | |
Current Violations | 4 | 10 | 3 | 1 | 18 | |
Initial Penalty | $47,486 | $1,159,663 | $259,203 | $9,461 | $0 | $1,475,813 |
Current Penalty | $47,486 | $1,159,663 | $259,203 | $9,461 | $0 | $1,475,813 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Serious | 19260020 B02 | 04/11/2017 | 04/19/2017 | $12,675 | $12,675 | $0 | 05/01/2017 | F - Formal Settlement | |
2. | 01002 | Serious | 19260102 A01 | 04/11/2017 | 04/19/2017 | $12,675 | $12,675 | $0 | 05/01/2017 | F - Formal Settlement | |
3. | 01003 | Serious | 19260303 B01 | 04/11/2017 | 04/19/2017 | $9,461 | $9,461 | $0 | 05/01/2017 | F - Formal Settlement | |
4. | 01004A | Serious | 19261053 B01 | 04/11/2017 | 04/19/2017 | $12,675 | $12,675 | $0 | 05/01/2017 | F - Formal Settlement | |
5. | 01004B | Serious | 19261053 B15 | 04/11/2017 | 04/19/2017 | $0 | $0 | $0 | 05/01/2017 | F - Formal Settlement | |
6. | 01004C | Serious | 19261053 B22 | 04/11/2017 | 04/19/2017 | $0 | $0 | $0 | 05/01/2017 | F - Formal Settlement | |
7. | 02001 | Willful | 19040040 A | 04/11/2017 | 04/19/2017 | $18,922 | $18,922 | $0 | 05/01/2017 | F - Formal Settlement | |
8. | 02002 | Willful | 19260021 B02 | 04/11/2017 | 05/09/2017 | $126,749 | $126,749 | $0 | 05/01/2017 | F - Formal Settlement | |
9. | 02003 | Willful | 19260021 B02 | 04/11/2017 | 05/09/2017 | $126,749 | $126,749 | $0 | 05/01/2017 | F - Formal Settlement | |
10. | 02004 | Willful | 19260021 B02 | 04/11/2017 | 05/09/2017 | $126,749 | $126,749 | $0 | 05/01/2017 | F - Formal Settlement | |
11. | 02005 | Willful | 19260021 B02 | 04/11/2017 | 05/09/2017 | $126,749 | $126,749 | $0 | 05/01/2017 | F - Formal Settlement | |
12. | 02006 | Willful | 19260021 B02 | 04/11/2017 | 05/09/2017 | $126,749 | $126,749 | $0 | 05/01/2017 | F - Formal Settlement | |
13. | 02007 | Willful | 19260651 C02 | 04/11/2017 | 04/19/2017 | $126,749 | $126,749 | $0 | 05/01/2017 | F - Formal Settlement | |
14. | 02008 | Willful | 19260651 I01 | 04/11/2017 | 04/19/2017 | $126,749 | $126,749 | $0 | 05/01/2017 | F - Formal Settlement | |
15. | 02009 | Willful | 19260651 K02 | 04/11/2017 | 04/19/2017 | $126,749 | $126,749 | $0 | 05/01/2017 | F - Formal Settlement | |
16. | 02010 | Willful | 19260652 A01 | 04/11/2017 | 04/19/2017 | $126,749 | $126,749 | $0 | 05/01/2017 | F - Formal Settlement | |
17. | 03001 | Repeat | 19260100 A | 04/11/2017 | 04/19/2017 | $66,227 | $66,227 | $0 | 05/01/2017 | F - Formal Settlement | |
18. | 03002 | Repeat | 19260651 I03 | 04/11/2017 | 04/19/2017 | $66,227 | $66,227 | $0 | 05/01/2017 | F - Formal Settlement | |
19. | 03003A | Repeat | 19260652 C01 | 04/11/2017 | 04/19/2017 | $126,749 | $126,749 | $0 | 05/01/2017 | F - Formal Settlement | |
20. | 03003B | Repeat | 19260652 C02 II | 04/11/2017 | 04/19/2017 | $0 | $0 | $0 | 05/01/2017 | F - Formal Settlement | |
21. | 03003C | Repeat | 19260652 D02 | 04/11/2017 | 04/19/2017 | $0 | $0 | $0 | 05/01/2017 | F - Formal Settlement | |
22. | 03003D | Repeat | 19260652 E01 II | 04/11/2017 | 04/19/2017 | $0 | $0 | $0 | 05/01/2017 | F - Formal Settlement | |
23. | 04001 | Other | 19040039 B02 | 04/11/2017 | $9,461 | $9,461 | $0 | 05/01/2017 | F - Formal Settlement |
Investigation Summary
At 1:00 p.m. on October 21, 2016, Employee #1 and #2 were preparing a trench for installation of a new sanitary sewer line. Both Employees were working at a depth of 11 feet and 11inches 2 events occurred, the straight cut walls of the trench caved in and a fire hydrant came loose from the water main from which it was attached. Soil covered Employees #1 and #2 and both were killed due to engulfment.
Keywords: Access/Egress, Asphyxiated, Trench
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 1186266.015 | 53 | M | Fatality | ||
2 | 1186266.015 | 47 | M | Fatality | Construction laborers |