Inspection Detail
Inspection: 1134967.015 - Jacksonville Marine Construction, Inc.
Inspection Information - Office: Jacksonville
Site Address:
Jacksonville Marine Construction, Inc.
8720 Mckenna Dr
Jacksonville, FL 32226
Mailing Address:
10945 Patton Road, Jacksonville, FL 32246
Union Status: NonUnion
SIC:
NAICS: 237990/Other Heavy and Civil Engineering Construction
Inspection Type: Fat/Cat
Scope: Complete
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 05/25/2016
Emphasis: L:Fall
Close Case:02/17/2021
Type | Activity Nr | Safety | Health |
---|---|---|---|
Accident | 1074172 | ||
Referral | 1101525 | Yes |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 10 | 3 | 13 | |||
Current Violations | 9 | 2 | 11 | |||
Initial Penalty | $66,100 | $0 | $0 | $4,200 | $0 | $70,300 |
Current Penalty | $35,150 | $0 | $0 | $700 | $0 | $35,850 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Serious | 19260605 B02 | 08/30/2016 | $4,000 | $4,988 | $0 | 09/22/2016 | F - Formal Settlement | ||
2. | 01002A | Serious | 19261412 D01 | 08/30/2016 | $3,650 | $6,236 | $0 | 09/22/2016 | F - Formal Settlement | ||
3. | 01002B | Serious | 19261412 E03 I A | 08/30/2016 | $0 | $0 | $0 | 09/22/2016 | F - Formal Settlement | ||
4. | 01002C | Serious | 19261412 F01 | 08/30/2016 | $0 | $0 | $0 | 09/22/2016 | F - Formal Settlement | ||
5. | 01003 | Serious | 19261415 A02 | 08/30/2016 | $4,500 | $8,730 | $0 | 09/22/2016 | F - Formal Settlement | ||
6. | 01004 | Serious | 19261417 O01 | 08/30/2016 | $4,500 | $8,730 | $0 | 09/22/2016 | F - Formal Settlement | ||
7. | 01005 | Serious | 19261424 A02 II | 08/30/2016 | $3,700 | $6,236 | $0 | 09/22/2016 | F - Formal Settlement | ||
8. | 01006 | Serious | 19261427 F01 | 08/30/2016 | 09/12/2016 | $6,236 | $6,236 | $0 | 09/22/2016 | F - Formal Settlement | Citation has been deleted. |
9. | 01007 | Serious | 19261428 A | 08/30/2016 | 01/30/2018 | $3,700 | $6,236 | $0 | 09/22/2016 | F - Formal Settlement | |
10. | 01008 | Serious | 19261437 E01 | 08/30/2016 | $3,700 | $6,236 | $0 | 09/22/2016 | F - Formal Settlement | ||
11. | 01009 | Serious | 19261437 E03 | 08/30/2016 | $3,700 | $6,236 | $0 | 09/22/2016 | F - Formal Settlement | ||
12. | 01010A | Serious | 19261437 H01 | 08/30/2016 | 01/30/2018 | $3,700 | $6,236 | $0 | 09/22/2016 | F - Formal Settlement | |
13. | 01010B | Serious | 19261437 H02 | 08/30/2016 | 01/30/2018 | $0 | $0 | $0 | 09/22/2016 | F - Formal Settlement | |
14. | 01010C | Serious | 19261437 H04 | 08/30/2016 | 01/30/2018 | $0 | $0 | $0 | 09/22/2016 | F - Formal Settlement | |
15. | 02001 | Other | 19040004 A | 08/30/2016 | 01/30/2018 | $700 | $700 | $0 | 09/22/2016 | F - Formal Settlement | |
16. | 02002 | Other | 19040039 A01 | 08/30/2016 | $3,500 | $3,500 | $0 | 09/22/2016 | F - Formal Settlement | Citation has been deleted. | |
17. | 02003 | Other | 19261433 D03 | 08/30/2016 | 01/30/2018 | $0 | $0 | $0 | 09/22/2016 | F - Formal Settlement |
Investigation Summary
At approximately 3:00 p.m. on March 5, 2016, an employee was unhooking a load by removing the sling from the wood piling. As the employee released the sling fro m the load, the hook swung a few feet and struck his hard hat. The employee rece ived head injuries and was killed.
Keywords:head, sling, struck by
# | Inspection | Age | Sex | Degree | Nature | Occupation |
---|---|---|---|---|---|---|
1 | 1134967.015 | Fatality | Construction laborers |