Inspection Detail
Inspection: 111966529 - All Pure Chemical Co.
Inspection Information - Office: Redding District Office
Site Address:
All Pure Chemical Co.
3721 Feather River Blvd.
Marysville, CA 95901
Mailing Address:
P. O. Box 205, Marysville, CA 95901
Union Status: NonUnion
SIC:5191
NAICS: 0
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 06/16/1995
Emphasis:
Case Closed: 06/29/1995
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 362112765 |
Investigation Summary
At 11:00 a.m. on May 18, 1995, Employee #1, of All Pure Chemical Co., was using a manual pallet jack and a motorized lift gate to unload pallets of swimming pool chlorine from a 35 ft trailer at a swimming pool accessory store. When the lift platform was in the 'up' position, it measured 53 in. high. The truck was parked on a slope. Employee #1 fell off the trailer and fractured the two bones in his left leg with a vertical split in the tibia that required the surgical insertion of three screws.
Keywords: DELIVERY WORK, FRACTURE, TIBIA, FALL, OFF LOADING, LEG
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 111966529 | Hospitalized injury | Fracture | Truck drivers, heavy |
Translate