Inspection: 111144747 - Duke Power Company

Inspection Information - Office: Nc Department Of Labor - Winston-Salem

 

Inspection Nr: 111144747
Report ID: 0453720
Date Opened: 12/16/1993

Site Address:
Duke Power Company
Pine Hall Road
Walnut Cove, NC 27052

Mailing Address:
P. O. Box 557, Walnut Cove, NC 27052

Union Status: NonUnion

SIC:4911

NAICS: 0 


Inspection Type: Accident

Scope: Partial

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 06/09/1994

Emphasis:

Case Closed: 02/26/1996


Related Activity
Type Activity Nr Safety Health
Accident 360492490
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 2 2
Current Violations 2 2
Initial Penalty $14,000 $0 $0 $0 $0 $14,000
Current Penalty $7,000 $0 $0 $0 $0 $7,000
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Serious 95012901 06/15/1994 07/18/1994 $3,500 $7,000 $0 I - Informal Settlement  
2. 01002 Serious 19100132 A 06/15/1994 06/21/1994 $3,500 $7,000 $0 I - Informal Settlement  

Investigation Summary

Investigation Nr: 947002
Event: 12/15/1993
EMPLOYEES BURNED BY STEAM AND SULFER FROM RUPTURED PIPE

Three employees were using a liquid propane torch to heat a pipe just below a check valve. They were using the torch to liquefy sulfur in the pipe. A pump on the system pumped the liquid sulfur to a burner. The employees were severely burned when a steam-jacketed molten-sulfur valve ruptured and sprayed steam and burning molten sulfur across their chests, faces, and upper extremities. They were hospitalized for their injuries. The pump, which was equipped with an internal hydraulic relief valve set to activate at 831 pascals, was malfunctioning before the incident. In addition, the relief valve on the pump was not designed to protect the rest of the system; the valves and associated piping had a pressure rating of only 50 pascals and did not have any type of relief valve. Fire-resistant jackets were provided to but not worn by the employees.

Keywords: BURN, CHEST, CLOTHING, RUPTURE, STEAM, ELEC UTILITY WORK, PIPE, FROZEN, FACE, PRESSURE RELEASE

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 111144747 Hospitalized injury Burn/Scald(Heat) Power plant operators
2 111144747 Hospitalized injury Burn/Scald(Heat) Power plant operators
3 111144747 Hospitalized injury Burn/Scald(Heat) Power plant operators
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.