Inspection: 111032975 - Carolina Power And Light
Inspection Information - Office: Sc Department Of Labor, Licensing, And Regulation
Site Address:
Carolina Power And Light
Hwy. 501
N. Marion, SC 29571
Mailing Address:
P. O. Box 1551, Raleigh, NC 27602
Union Status: NonUnion
SIC:1623
NAICS: 0
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 03/11/1991
Planning Guide: Safety-Construction
Emphasis:
Case Closed: 04/24/1991
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 360496293 |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 1 | 1 | ||||
| Current Violations | 1 | 1 | ||||
| Initial Penalty | $560 | $0 | $0 | $0 | $0 | $560 |
| Current Penalty | $560 | $0 | $0 | $0 | $0 | $560 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 02001 | Serious | 19260955 C02 | 03/29/1991 | 04/03/1991 | $560 | $560 | $0 | - |
Investigation Summary
A CREW OF EMPLOYEES HAD BEEN WORKING AT A SUBSTATION, INSTALLING MOBILE TRANSFORMERS OUTSIDE THE FENCE OF THE SUBSTATION. THE EMPLOYEES HAD CONDUCTED A PRE-JOB BRIEFING; HOWEVER, IT DID NOT COVER THE PLAN OF OPERATION OR SPECIFIC PROCEDURES TO BE USED. THE CREW WAS COMPLETING THE JOB, STRINGING THREE PHASE CONDUCTORS FROM THE TRANSFORMERS TO THE 23-KILOVOLT POWER LINE COMING OUT OF THE SUBSTATION. TWO EMPLOYEES WERE WORKING OUT OF A TWO-PERSON AERIAL LIFT BUCKET. THEY HAD CONNECTED THE CENTER PHASE, AND AN EMPLOYEE ON THE GROUND WAS READYING THE TOP PHASE CONDUCTOR SO THAT HE COULD HAND IT TO THE EMPLOYEES IN THE AERIAL LIFT. AS HE WAS DOING THIS, THE PHASE HE WAS HANDLING CONTACTED THE CONDUCTOR THAT HAD ALREADY BEEN CONNECTED. THE EMPLOYEE ON THE GROUND RECEIVED AN ELECTRIC SHOCK AND SEVERE BURNS. HE WAS HOSPITALIZED FOR HIS INJURIES.
Keywords: BURN, OVERHEAD POWER LINE, ELECTRICAL, POWER LINE WORKER, E PTD, ELEC UTILITY WORK, ELECTRIC CONDUCTOR, ELECTRIC SHOCK
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 111032975 | Hospitalized injury | Electric Shock | Electrical power installers and repairers |