Inspection Detail
Inspection: 109180059 - Coverflex Manufacturing Inc.
Inspection Information - Office: Bridgeport Area Office
Site Address:
Coverflex Manufacturing Inc.
1349 River Road
Middletown, CT 06450
Mailing Address:
6828 La Paseo St, Houston, TX 77087
Union Status: Union
SIC:1799
NAICS: 238990/All Other Specialty Trade Contractors
Inspection Type: Accident
Scope: Complete
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 08/02/2010
Emphasis:
Case Closed: 09/06/2011
Type | Activity Nr | Safety | Health |
---|---|---|---|
Accident | 101521128 |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 6 | 6 | ||||
Current Violations | 2 | 2 | ||||
Initial Penalty | $42,000 | $0 | $0 | $0 | $0 | $42,000 |
Current Penalty | $0 | $0 | $0 | $4,000 | $0 | $4,000 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Serious | 19260021 B02 | 08/03/2010 | 08/09/2010 | $7,000 | $7,000 | $0 | I - Informal Settlement | Citation has been deleted. | |
2. | 01002 | Other | 19260065 Q01 | 08/03/2010 | 08/09/2010 | $2,000 | $7,000 | $0 | I - Informal Settlement | ||
3. | 01003 | Other | 19260150 E01 | 08/03/2010 | 08/09/2010 | $2,000 | $7,000 | $0 | I - Informal Settlement | ||
4. | 01004 | Serious | 19260150 E02 | 08/03/2010 | 08/09/2010 | $7,000 | $7,000 | $0 | I - Informal Settlement | Citation has been deleted. | |
5. | 01005 | Serious | 19260352 C | 08/03/2010 | 08/09/2010 | $7,000 | $7,000 | $0 | I - Informal Settlement | Citation has been deleted. | |
6. | 01006 | Serious | 19260501 B04 I | 08/03/2010 | 08/09/2010 | $7,000 | $7,000 | $0 | I - Informal Settlement | Citation has been deleted. |
Investigation Summary
On February 7, 2010, subcontractors, working as direct subs of O & G Industries, were on site at the 620 MW Combined Cycle Electric Generating Facility, located in Middletown, CT. A natural gas explosion occurred. The project consisted of two Siemens SGT6-5000F dual fuel combustion turbines, one high-pressure Siemens SST-5000 steam turbine, heat recovery steam generators, cooling towers, DCS instrument and control system, and a 345 kV gas-insulated switchyard with step-up transformers. O&G was overseeing all local, state, and federal permitting, engineering, and construction of this project. O&G responsibilities also included the overview of all environmental site engineering for air, noise, water and electrical interconnect; design basis configuration for all mechanical, electrical, and civil/structural engineering; the construction execution plan; cost estimate; and schedule. The nature of the event or injuries was not specified in the original narrative.
Keywords: CONSTRUCTION, NATURAL GAS, GAS, ELECTRIC GENERATOR
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 109180059 | Fatality | Other | Occupation Not Listed |