Inspection Detail
Inspection: 108824541 - B & P Industrial, Inc.
Inspection Information - Office: Cleveland Area Office
Site Address:
B & P Industrial, Inc.
8644 Station Street
Mentor, OH 44060
Mailing Address:
4699 N. Federal Highway #101e, Pompano Beach, FL 33064
Union Status: NonUnion
SIC:1721
NAICS: 0
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 04/12/1993
Planning Guide: Safety-Construction
Emphasis: L:Fall
Case Closed: 04/20/2000
Type | Activity Nr | Safety | Health |
---|---|---|---|
Accident | 361105182 |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 12 | 4 | 2 | 18 | ||
Current Violations | 12 | 4 | 2 | 18 | ||
Initial Penalty | $20,800 | $56,000 | $0 | $400 | $0 | $77,200 |
Current Penalty | $3,720 | $4,000 | $0 | $0 | $0 | $7,720 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001A | Serious | 19100244 B | 04/12/1993 | 04/15/1993 | $310 | $2,000 | $0 | 04/26/1993 | F - Formal Settlement | |
2. | 01001B | Serious | 19100244 B | 04/12/1993 | 04/15/1993 | $0 | $0 | $0 | 04/26/1993 | F - Formal Settlement | |
3. | 01002 | Serious | 19260020 B02 | 04/12/1993 | 04/15/1993 | $310 | $2,000 | $0 | 04/26/1993 | F - Formal Settlement | |
4. | 01003A | Serious | 19260021 B02 | 04/12/1993 | 05/15/1993 | $310 | $2,000 | $0 | 04/26/1993 | F - Formal Settlement | |
5. | 01003B | Serious | 19261060 A | 04/12/1993 | 05/15/1993 | $0 | $0 | $0 | 04/26/1993 | F - Formal Settlement | |
6. | 01004 | Serious | 19260100 A | 04/12/1993 | 04/15/1993 | $310 | $800 | $0 | 04/26/1993 | F - Formal Settlement | |
7. | 01005A | Serious | 19260404 B01 I | 04/12/1993 | 04/15/1993 | $310 | $2,000 | $0 | 04/26/1993 | F - Formal Settlement | |
8. | 01005B | Serious | 19260404 F07 IVA | 04/12/1993 | 04/15/1993 | $0 | $0 | $0 | 04/26/1993 | F - Formal Settlement | |
9. | 01006 | Serious | 19260405 A02 IIE | 04/12/1993 | 04/15/1993 | $310 | $2,000 | $0 | 04/26/1993 | F - Formal Settlement | |
10. | 01007 | Serious | 19260405 B02 | 04/12/1993 | 04/15/1993 | $310 | $1,000 | $0 | 04/26/1993 | F - Formal Settlement | |
11. | 01008A | Serious | 19260451 A13 | 04/12/1993 | 04/15/1993 | $310 | $2,000 | $0 | 04/26/1993 | F - Formal Settlement | |
12. | 01008B | Serious | 19261053 A07 | 04/12/1993 | 04/15/1993 | $0 | $0 | $0 | 04/26/1993 | F - Formal Settlement | |
13. | 01008C | Serious | 19261053 B04 | 04/12/1993 | 04/15/1993 | $0 | $0 | $0 | 04/26/1993 | F - Formal Settlement | |
14. | 01009 | Serious | 19260451 I01 | 04/12/1993 | 04/15/1993 | $310 | $1,000 | $0 | 04/26/1993 | F - Formal Settlement | |
15. | 01010A | Serious | 19260451 I02 | 04/12/1993 | 04/15/1993 | $310 | $2,000 | $0 | 04/26/1993 | F - Formal Settlement | |
16. | 01010B | Serious | 19260451 I11 | 04/12/1993 | 04/15/1993 | $0 | $0 | $0 | 04/26/1993 | F - Formal Settlement | |
17. | 01011A | Serious | 19260451 I05 | 04/12/1993 | 04/15/1993 | $310 | $2,000 | $0 | 04/26/1993 | F - Formal Settlement | |
18. | 01011B | Serious | 19260451 I10 IV | 04/12/1993 | 04/15/1993 | $0 | $0 | $0 | 04/26/1993 | F - Formal Settlement | |
19. | 01012 | Serious | 19261053 A19 | 04/12/1993 | 04/15/1993 | $310 | $2,000 | $0 | 04/26/1993 | F - Formal Settlement | |
20. | 02001A | Willful | 5A0001 | 04/12/1993 | 04/15/1993 | $1,000 | $14,000 | $0 | 04/26/1993 | F - Formal Settlement | |
21. | 02001B | Willful | 19260021 B06 I | 04/12/1993 | 04/15/1993 | $0 | $0 | $0 | 04/26/1993 | F - Formal Settlement | |
22. | 02002A | Willful | 19100094 A05 IIB | 04/12/1993 | 04/15/1993 | $1,000 | $14,000 | $0 | 04/26/1993 | F - Formal Settlement | |
23. | 02002B | Willful | 19260103 A02 | 04/12/1993 | 04/15/1993 | $0 | $0 | $0 | 04/26/1993 | F - Formal Settlement | |
24. | 02002C | Willful | 19260103 C01 | 04/12/1993 | 04/15/1993 | $0 | $0 | $0 | 04/26/1993 | F - Formal Settlement | |
25. | 02003 | Willful | 19260028 A | 04/12/1993 | 04/15/1993 | $1,000 | $14,000 | $0 | 04/26/1993 | F - Formal Settlement | |
26. | 02004A | Willful | 19260059 E01 | 04/12/1993 | 05/15/1993 | $1,000 | $14,000 | $0 | 04/26/1993 | F - Formal Settlement | |
27. | 02004B | Willful | 19260059 H02 | 04/12/1993 | 05/15/1993 | $0 | $0 | $0 | 04/26/1993 | F - Formal Settlement | |
28. | 03001A | Other | 19260050 B | 04/12/1993 | 04/15/1993 | $0 | $400 | $0 | 04/26/1993 | F - Formal Settlement | |
29. | 03001B | Other | 19260050 F | 04/12/1993 | 04/15/1993 | $0 | $0 | $0 | 04/26/1993 | F - Formal Settlement | |
30. | 03002 | Other | 19260403 B02 | 04/12/1993 | 04/15/1993 | $0 | $0 | $0 | 04/26/1993 | F - Formal Settlement |
Investigation Summary
On December 4, 1992, Employee #1, a supervisor for B & P Industrial, Inc., was on an elevated work platform (pic) in Mentor, OH, sandblasting in a large water storage tank. The platform was without guardrails and Employee #1 was not using any other form of fall protection. A mechanical failure in a come-along that was keeping a guide wire taut allowed the pic to shift, throwing Employee #1 off. He fell approximately 100 ft and was killed.
Keywords: WORK RULES, ELEVATED WORK PLAT, SANDBLASTING, WATER TANK, GUARDRAIL, CONSTRUCTION, UNSTABLE SURFACE, FALL, FALL PROTECTION, MECH MALFUNCTION
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 108824541 | Fatality | Concussion | Occupation not reported |