Inspection Detail
Inspection: 108755588 - M & K Electrical Company Inc.
Inspection Information - Office: Pittsburgh Area Office
Site Address:
M & K Electrical Company Inc.
Air Force Reserve Base, G.P.I.A.
Pittsburgh, PA 15231
Mailing Address:
505 Hudson Avenue, Monongahela, PA 15063
Union Status: NonUnion
SIC:1731
NAICS: 0
Inspection Type: Accident
Scope: Complete
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 09/30/1993
Emphasis:
Case Closed: 08/01/1994
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 360845119 |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 5 | 5 | ||||
| Current Violations | 5 | 5 | ||||
| Initial Penalty | $21,000 | $0 | $0 | $0 | $0 | $21,000 |
| Current Penalty | $11,000 | $0 | $0 | $0 | $0 | $11,000 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001A | Serious | 19260416 A03 | 09/30/1993 | 10/05/1993 | $2,200 | $4,200 | $0 | 10/19/1993 | J - ALJ Decision | |
| 2. | 01001B | Serious | 19260020 B01 | 09/30/1993 | 10/05/1993 | $0 | $0 | $0 | 10/19/1993 | J - ALJ Decision | |
| 3. | 01001C | Serious | 19260020 B02 | 09/30/1993 | 10/05/1993 | $0 | $0 | $0 | 10/19/1993 | J - ALJ Decision | |
| 4. | 01002 | Serious | 19260021 B02 | 09/30/1993 | 10/05/1993 | $2,200 | $4,200 | $0 | 10/19/1993 | J - ALJ Decision | |
| 5. | 01003A | Serious | 19260950 C01 I | 09/30/1993 | 10/05/1993 | $2,200 | $4,200 | $0 | 10/19/1993 | J - ALJ Decision | |
| 6. | 01003B | Serious | 19260950 C01 II | 09/30/1993 | 10/05/1993 | $0 | $0 | $0 | 10/19/1993 | J - ALJ Decision | |
| 7. | 01004 | Serious | 19260955 C03 | 09/30/1993 | 10/05/1993 | $2,200 | $4,200 | $0 | 10/19/1993 | J - ALJ Decision | |
| 8. | 01005 | Serious | 19260959 A01 | 09/30/1993 | 10/05/1993 | $2,200 | $4,200 | $0 | 10/19/1993 | J - ALJ Decision |
Investigation Summary
A power line worker was removing one conductor of an overhead power line. He was passing the conductor between two 2400-volt overhead conductors that were about 18 inches apart. The employee contacted the energized power line and was electrocuted.
Keywords: ELEC PROTECT EQUIP, OVERHEAD POWER LINE, ELECTRICAL, POWER LINE WORKER, ELECTROCUTED, E PTD, ELEC UTILITY WORK
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 108755588 | Fatality | Electric Shock | Electrical power installers and repairers |
Translate