Powered by GoogleTranslate

Inspection Detail

Inspection: 108504218 - Otero County Electric Cooperative Inc

Inspection Information - Office: State Of New Mexico Environment Department Occupational Health & Safety Bureau

 

Inspection Nr: 108504218
Report ID: 0653510
Date Opened: 03/21/1991

Site Address:
Otero County Electric Cooperative Inc
Oro Grande Water Tank Control Microwave Tower
Cloudcroft, NM 88317

Mailing Address:
Po Box 227, Cloudcroft, NM 88317

Union Status: NonUnion

SIC:4911

NAICS: 0 


Inspection Type: Accident

Scope: Partial

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 03/22/1991

Emphasis:

Case Closed: 11/25/1991


Related Activity
Type Activity Nr Safety Health
Accident 360249536
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 6 6
Current Violations 1 1
Initial Penalty $5,050 $0 $0 $0 $0 $5,050
Current Penalty $1,000 $0 $0 $0 $0 $1,000
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Serious 19260020 B02 06/25/1991 01/25/1992 $1,000 $1,000 $0 07/09/1991 F - Formal Settlement  
2. 01002 Serious 19260950 D01 IV 06/25/1991 07/02/1991 $810 $810 $0 07/09/1991 F - Formal Settlement Citation has been deleted.
3. 01003 Serious 19260950 D01 VI 06/25/1991 07/02/1991 $810 $810 $0 07/09/1991 F - Formal Settlement Citation has been deleted.
4. 01004 Serious 19260950 D10 VII 06/25/1991 07/02/1991 $810 $810 $0 07/09/1991 F - Formal Settlement Citation has been deleted.
5. 01005 Serious 19260954 F 06/25/1991 07/02/1991 $810 $810 $0 07/09/1991 F - Formal Settlement Citation has been deleted.
6. 01006 Serious 19260955 C02 06/25/1991 07/02/1991 $810 $810 $0 07/09/1991 F - Formal Settlement Citation has been deleted.

Investigation Summary

Investigation Nr: 14302210
Event: 02/15/1991
ELECTRIC SHOCK - DIRECT CONTACT WITH OVERHEAD LINE

Three power line crews were working in the final phase of the installation of a 14.4-kilovolt overhead power line to a cellular relay station. The three crews were working in three different places along the 1.4 kilometers of power line. Because of the terrain and distance involved, the crews could not see each other while they were working. One crew was installing meters. A second crew was replacing a bell insulator and installing the tap from an existing power line to the new one. The third crew had deenergized the existing line and was waiting for the job to be completed to reenergize it. None of the crews was using protective grounds or tags. After they finished their job, the first crew needed the line energized so that they could test the meters. The first crew called the third crew to report that they were ready. The third crew misinterpreted the call as an order and energized the line without checking with the second crew. A power line worker on the second crew had just installed the tap when the line was reenergized. The employee received an electric shock and was apparently hospitalized. He survived the electric shock; unfortunately, he died from an embolism several days after the accident.

Keywords: EMBOLISM, OVERHEAD POWER LINE, PROTECTIVE GROUNDING, ELECTRICAL, POWER LINE WORKER, LOCKOUT, E PTD, ELEC UTILITY WORK, ELECTRIC SHOCK

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 108504218 Fatality Electric Shock Electrical power installers and repairers
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close