Inspection Detail
Inspection: 107456584 - Epic Metal Corp.
Inspection Information - Office: Springfield Area Office
Site Address:
Epic Metal Corp.
Fuller Laboratories Wpf Salisbury St.
Worcester, MA 01602
Mailing Address:
11 Talbot Ave., Rankin, PA 15104
Union Status: NonUnion
SIC:3444
NAICS: 0
Inspection Type: Unprog Rel
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 01/06/1989
Planning Guide: Safety-Construction
Emphasis:
Case Closed: 03/13/1989
Investigation Summary
On December 13, 1988, after numerous attempts to pour and delays due to cold weather, the pour for level 2 (area A-B-5-6 in particular) began. This area was poured with 4 3/4 in. of concrete (mat included). Approximately two hours later, a 3 in. sheet of insulation was placed, followed by an additional 3 in. slab of concrete (actually closer to 4 in.). As the last of the concrete was being placed by the six concrete workers, the 22 gauge epicore metal deck collapsed. Employees #1 through #5 fell 42 feet while a coworker clung to the building structure. They sustained broken bones and bruises.
Keywords: COLLAPSE, CONCRETE FORM WORK, CONTUSION, FRACTURE, CONSTRUCTION
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 107456584 | Occupation Not Listed |