Inspection Detail
Inspection: 106203938 - Plymouth Development Corp.
Inspection Information - Office: Tampa Area Office
Site Address:
Plymouth Development Corp.
1000 Cove Cay Drive
Clearwater, FL 34620
Mailing Address:
26750 U.S. 19 N., Suite 301, Clearwater, FL 34620
Union Status: NonUnion
SIC:1522
NAICS: 0
Inspection Type: Unprog Rel
Scope: Complete
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 10/12/1990
Planning Guide: Safety-Construction
Emphasis:
Case Closed: 12/11/1990
Type | Activity Nr | Safety | Health |
---|---|---|---|
Accident | 360149637 |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 7 | 7 | ||||
Current Violations | 7 | 7 | ||||
Initial Penalty | $2,450 | $0 | $0 | $0 | $0 | $2,450 |
Current Penalty | $1,700 | $0 | $0 | $0 | $0 | $1,700 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Serious | 19260500 D01 | 10/23/1990 | 10/26/1990 | $290 | $420 | $0 | I - Informal Settlement | ||
2. | 01002 | Serious | 19260500 E01 II | 10/23/1990 | 10/29/1990 | $190 | $280 | $0 | I - Informal Settlement | ||
3. | 01003 | Serious | 19260552 A02 | 10/23/1990 | 10/26/1990 | $50 | $60 | $0 | I - Informal Settlement | ||
4. | 01004 | Serious | 19260552 B01 I | 10/23/1990 | 10/26/1990 | $190 | $280 | $0 | I - Informal Settlement | ||
5. | 01005 | Serious | 19260552 B02 | 10/23/1990 | 10/26/1990 | $290 | $420 | $0 | I - Informal Settlement | ||
6. | 01006 | Serious | 19260552 B04 | 10/23/1990 | 10/26/1990 | $240 | $350 | $0 | I - Informal Settlement | ||
7. | 01007A | Serious | 19260552 B05 | 10/23/1990 | 10/26/1990 | $450 | $640 | $0 | I - Informal Settlement | ||
8. | 01007B | Serious | 19260552 B05 II | 10/23/1990 | 10/26/1990 | $0 | $0 | $0 | - |
Investigation Summary
AN APPRENTICE POWER LINE WORKER FOR AN ELECTRIC UTILITY WAS MAKING CONNECTIONS IN A THREE-PHASE, 120/208-VOLT, 150 KILOVOLT-AMPERE, PAD-MOUNTED TRANSFORMER. HE AND THE JOURNEYMAN POWER LINE WORKER ON THE JOB HAD CONNECTED THE THREE NEUTRAL CONDUCTORS AND THE THREE B-PHASE CONDUCTORS. HOWEVER, ONE OF THE A-PHASE CONDUCTORS STARTED TO BIRD CAGE AS THE APPRENTICE WAS INSTALLING IT IN THE REAR HOLE IN THE SPADE BLOCK. THE APPRENTICE RAISED UP AND LEANED INTO THE CABINET. HIS CHEST CONTACTED AN ENERGIZED PART, AND HE WAS ELECTROCUTED.
Keywords: ELECTRICAL, POWER LINE WORKER, ELECTROCUTED, ELEC UTILITY WORK, TRANSFORMER, E PTD
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 106203938 | Occupation Not Listed |