Powered by GoogleTranslate

Inspection Detail

Inspection: 106186703 - All-Nu Contracting, Corp.

Inspection Information - Office: Manhattan Area Office

 

Inspection Nr: 106186703
Report ID: 0215000
Date Opened: 06/22/1992

Site Address:
All-Nu Contracting, Corp.
115 East 100th Street
New York, NY 10029

Mailing Address:
3356 11th Street, Long Island City, NY 11106

Union Status: NonUnion

SIC:1522

NAICS: 0 


Inspection Type: Unprog Rel

Scope: Complete

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 07/24/1992

Planning Guide: Safety-Construction

Emphasis: L:Gutreh

Case Closed: 11/22/1993


Related Activity
Type Activity Nr Safety Health
Inspection 101488435
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 4 1 5
Current Violations 4 1 5
Initial Penalty $5,100 $0 $0 $300 $0 $5,400
Current Penalty $3,020 $0 $0 $210 $0 $3,230
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Serious 19260028 A 08/27/1992 09/01/1992 $1,050 $1,500 $0 I - Informal Settlement  
2. 01002 Serious 19260403 B01 08/27/1992 09/01/1992 $735 $1,050 $0 I - Informal Settlement  
3. 01003 Serious 19260404 B01 II 08/27/1992 09/01/1992 $735 $1,050 $0 I - Informal Settlement  
4. 01004 Serious 19260500 B08 08/27/1992 09/01/1992 $500 $1,500 $0 I - Informal Settlement  
5. 02001 Other 19040002 A 08/27/1992 09/01/1992 $210 $300 $0 I - Informal Settlement  

Investigation Summary

Investigation Nr: 645226
Event: 06/11/1992
Employee killed, others burned when gas system explodes

In the basement burner room on the north side of the building, employees were bleeding air from gas lines over and around a twin 1 million BTU Weil-McLain two-zone gas heating system. This enclosed space was approximately 14 ft by 16 ft. A gas buildup occurred when the pipe unions were opened. The subcontractor allegedly tried to light the pilot with a cigarette lighter. The explosion killed Employee #1, the project manager, and severely burned three plumbers and the owner/carpenter contractor. This was an electronic ignition system. The building had 51 apartments ready for occupancy.

Keywords: CONSTRUCTION, GAS, EXPLOSION, STRUCK BY

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 106186703 Hospitalized injury Burn/Scald(Heat) Occupation not reported
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.