Inspection: 104514104 - Hutchinson Utilities Commission

Inspection Information - Office: Minnesota Department Of Labor And Industry

 

Inspection Nr: 104514104
Report ID: 0552700
Date Opened: 09/29/1986

Site Address:
Hutchinson Utilities Commission
225 Michigan St.
Hutchinson, MN 55350

Mailing Address:
, , 00000

Union Status: Union

SIC:4911

NAICS: 0 


Inspection Type: Accident

Scope: Partial

Advanced Notice: N

Ownership: LocalGovt

Safety/Health: Safety

Close Conference: 09/29/1986

Emphasis:

Case Closed: 10/20/1986


Related Activity
Type Activity Nr Safety Health
Accident 360761134
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations 1 1
Initial Penalty $292 $0 $0 $0 $0 $292
Current Penalty $292 $0 $0 $0 $0 $292
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Serious 19260957 A 2 10/13/1986 10/16/1986 $292 $292 $0 -  

Investigation Summary

Investigation Nr: 14445563
Event: 09/25/1986
ELECTRIC SHOCK - CONTACT WITH LIVE PART THROUGH KNIFE

DIESEL GENERATORS WERE SUPPLYING 4160-VOLT 3-PHASE POWER THROUGH 6 MAIN BREAKERS IN A SWITCHGEAR HOUSE FOR OVERHEAD AND UNDERGROUND DISTRIBUTION LINES. BREAKER #6 WAS AN OLDER-STYLE UNIT AND WAS TO BE ELIMINATED FROM USE SINCE REPLACEMENT PARTS WERE NO LONGER AVAILABLE. TWO QUALIFIED ELECTRICIANS, WHO HAD BEEN WORKING ON THE JOB FOR SEVERAL DAYS, HAD CUT THE PRIMARY LEADS TO THIS BREAKER ABOUT 2 FEET BEHIND THE TERMINAL CONNECTIONS ON THE GENERATOR SIDE OF THE BREAKER. THEY HAD TRANSFERRED THE LEADS OVER TO ANOTHER BREAKER. ONE OF THE ELECTRICIANS WAS CUTTING THE INSULATING TAPE LOOSE FROM THE TERMINAL CONNECTIONS ON THE GENERATOR SIDE OF BREAKER #6 SO THAT THE 2-FOOT-LONG STUBS COULD BE REMOVED. HE THEN REACHED UPWARD AND BEHIND THE #6 BREAKER TERMINAL CONNECTIONS ABOUT 1.5 FEET IN AN ATTEMPT TO CUT THE INSULATING TAPE LOOSE FROM THE VERTICAL BUSBAR FOR ONE OF THE PHASES ABOVE BREAKER #6. THE VERTICAL BUSBAR WAS STILL ENERGIZED FROM A COMMON OVERHEAD BUS, BECAUSE A DISCONNECT SWITCH HAD NOT BEEN OPENED. WHEN THE ELECTRICIAN REACHED UP, HE CONTACTED THE ENERGIZED CONDUCTOR THROUGH THE KNIFE HE WAS USING. HE WAS GROUNDED AT HIS SHOULDER, WHICH WAS IN CONTACT WITH A METAL SUPPORT BAR. THE EMPLOYEE LOST CONSCIOUSNESS FOR A SHORT TIME AND FELL BACKWARD TO THE GROUND. HE SUSTAINED SERIOUS BURNS TO HIS RIGHT HAND AND LEFT SHOULDER.

Keywords: ELECTRICAL, ELECTRICIAN, BUSBAR, LOCKOUT, E PTD, ELEC UTILITY WORK, ELECTRIC SHOCK, SWITCHGEAR, BLIND REACHING

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 104514104 Hospitalized injury Electric Shock Supervisors; electricians & power transm. install.
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.