Powered by GoogleTranslate

Inspection Detail

Inspection: 104341672 - East & Westbrook Conrete Construction Co

Inspection Information - Office: Ky Labor Cabinet Division Of Osh Compliance

 

Inspection Nr: 104341672
Report ID: 0452110
Date Opened: 06/29/1989

Site Address:
East & Westbrook Conrete Construction Co
U S Highway 42
Carrollton, KY 41008

Mailing Address:
P O Box 116, Buckner, KY 40010

Union Status: NonUnion

SIC:1771

NAICS: 0 


Inspection Type: Unprog Rel

Scope: Partial

Advanced Notice: N

Ownership: Private

Safety/Health: Health

Close Conference: 08/10/1989

Emphasis:

Case Closed: 11/09/1989


Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations 1 1
Initial Penalty $0 $0 $0 $0 $0 $0
Current Penalty $0 $0 $0 $0 $0 $0
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citation Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Other 19260059 H 09/28/1989 10/24/1989 $0 $0 $0 -  

Investigation Summary

Investigation Nr: 739920
Event: 06/29/1989
Employees exposed to hydrogen chloride release

On June 29, 1989, a mechanical failure in a processor at Dow Corning caused the compressor to divert to a scrubber. Due to insufficient water pressure in the scrubber, approximately 70 lb of hydrogen chloride was released over a 5 minute period. The chemical formed a cloud which was carried by the wind (which was blowing 10 mph from the east) to the Namex construction site approximately 800 yards away. (Namex is a part of Dow Corning). No alarm was sounded. The only warning sign was the cloud. Employees who saw the cloud alerted others and headed for the gates. Employees working on the structures or with their backs to the cloud had no warning until the odor from the cloud reached them. One employee was trapped on the cable tray throughout the entire 2 to 4 minutes of exposure. He was taken by ambulance to the hospital; 47 other exposed employees followed in cars shortly thereafter. Employees #1 through #48 were treated and released. Very few experienced any adverse health effects. With the exception of one employee, all were fully recovered by the next shift. That employee recovered in 2 days.

Keywords: ALARM, TOXIC FUMES, HYDROGEN CHLORIDE, EQUIPMENT FAILURE

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 104341672 Non Hospitalized injury Other Concrete and terrazzo finishers
2 104341672 Non Hospitalized injury Other Concrete and terrazzo finishers
3 104341672 Non Hospitalized injury Other Concrete and terrazzo finishers
4 104341672 Non Hospitalized injury Other Concrete and terrazzo finishers
5 104341672 Non Hospitalized injury Other Concrete and terrazzo finishers
6 104341672 Non Hospitalized injury Other Concrete and terrazzo finishers
7 104341672 Non Hospitalized injury Other Concrete and terrazzo finishers
8 104341672 Non Hospitalized injury Other Concrete and terrazzo finishers
9 104341672 Non Hospitalized injury Other Concrete and terrazzo finishers
10 104341672 Non Hospitalized injury Other Concrete and terrazzo finishers
11 104341672 Non Hospitalized injury Other Concrete and terrazzo finishers
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.