Inspection Detail
Inspection: 103624870 - Tri-O, Inc.
Inspection Information - Office: Lubbock Area Office
Site Address:
Tri-O, Inc.
Power Transmission Line Structure 78
Fort Bliss Range, Dona Ana Cy, NM 88072
Mailing Address:
1976 Sw Temple St., Salt Lake City, UT 84115
Union Status: NonUnion
SIC:1623
NAICS: 0
Inspection Type: Accident
Scope: Partial
Advanced Notice: Y
Ownership: Private
Safety/Health: Safety
Close Conference: 06/05/1997
Emphasis:
Case Closed: 04/22/1998
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 360378061 |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 4 | 4 | ||||
| Current Violations | 2 | 2 | ||||
| Initial Penalty | $14,000 | $0 | $0 | $0 | $0 | $14,000 |
| Current Penalty | $2,450 | $0 | $0 | $0 | $0 | $2,450 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Serious | 19260020 A01 | 06/09/1997 | 07/12/1997 | $0 | $3,500 | $0 | A - Amendment | Citation has been deleted. | |
| 2. | 01002 | Serious | 19260021 B02 | 06/09/1997 | 07/12/1997 | $1,225 | $3,500 | $0 | J - ALJ Decision | ||
| 3. | 01003 | Serious | 19260954 A | 06/09/1997 | 07/12/1997 | $1,225 | $3,500 | $0 | J - ALJ Decision | ||
| 4. | 01004 | Serious | 19260954 C | 06/09/1997 | 07/12/1997 | $0 | $3,500 | $0 | J - ALJ Decision | Citation has been deleted. |
Investigation Summary
A supervisory power line worker was grounding a deenergized 345-kilovolt overhead power line. A parallel, energized 345-kilovolt power line was located 25 to 30 meters away. The employee was using an aerial lift with a metal platform. He had attached the grounding cable to one of the two system grounds and had lowered the aerial lift to connect the other end of the cable to the center phase conductor of the power line. Another cable was on the floor of the aerial lift platform. This cable, which was hanging partway off the aerial lift platform, contacted the center phase conductor. When the employee placed his hand and the grounding cable on the top rail of the platform, he was electrocuted. The parallel line had induced voltage in the deenergized line. An engineer on site estimated that the induced voltage could have been as high as 10 kilovolts.
Keywords: OVERHEAD POWER LINE, PROTECTIVE GROUNDING, ELECTRICAL, POWER LINE WORKER, ELECTRIC CABLE, ELECTROCUTED, E PTD, INDUCED CURRENT, ELEC UTILITY WORK, AERIAL LIFT
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 103624870 | Fatality | Electric Shock | Supervisors; electricians & power transm. install. |
Translate