Inspection: 102835030 - Gainesville Pipeline Contractors, Inc.
Inspection Information - Office: Atlanta East Area Office
Site Address:
Gainesville Pipeline Contractors, Inc.
Wyngate Parkway
Woodstock, GA 30118
Mailing Address:
P.O. Box 2454, Gainesville, GA 30503
Union Status: NonUnion
SIC:1623
NAICS: 0
Inspection Type: Referral
Scope: Complete
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 09/15/1988
Planning Guide: Safety-Construction
Emphasis:
Case Closed: 01/06/1989
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Referral | 900969551 | Yes | Yes |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 3 | 3 | 6 | |||
| Current Violations | 3 | 3 | 6 | |||
| Initial Penalty | $1,920 | $0 | $0 | $0 | $0 | $1,920 |
| Current Penalty | $960 | $0 | $0 | $0 | $0 | $960 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Serious | 5A0001 | 09/26/1988 | 09/29/1988 | $320 | $640 | $0 | I - Informal Settlement | ||
| 2. | 01002 | Serious | 19260020 B01 | 09/26/1988 | 10/14/1988 | $320 | $640 | $0 | I - Informal Settlement | ||
| 3. | 01003 | Serious | 19260021 B06 I | 09/26/1988 | 10/14/1988 | $320 | $640 | $0 | I - Informal Settlement | ||
| 4. | 02001 | Other | 19030002 A01 | 09/26/1988 | 09/29/1988 | $0 | $0 | $0 | - | ||
| 5. | 02002 | Other | 19040002 A | 09/26/1988 | 10/31/1988 | $0 | $0 | $0 | - | ||
| 6. | 02003 | Other | 19040005 A | 09/26/1988 | 10/31/1988 | $0 | $0 | $0 | - |
Investigation Summary
Employee #2 went into a 15 ft deep 4 ft diameter sewer manhole to grout around the joints. The manhole was new and had not been connected to an active sewer line. Employee #2 worked near the top of the manhole, then came out because it was too hot. Employee #1 went to the bottom of the manhole to clean it out and was almost immediately in distress. Employees #3 and #2 went into the manhole to rescue him. They tied a rope around Employee #1, pulled him out, and somehow were able to climb out themselves. Employee #1 spent the night in the hospital. Employees #2 and #3 were treated and released from the hospital. The manhole had been installed about 3 months earlier and was just opened a few minutes before work began. About 18 hours after the accident, the oxygen level in the manhole was .7 percent.
Keywords: OXYGEN, CONSTRUCTION, MANHOLE
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 102835030 | Non Hospitalized injury | Asphyxia | Occupation not reported | ||
| 2 | 102835030 | Hospitalized injury | Asphyxia | Occupation not reported | ||
| 3 | 102835030 | Non Hospitalized injury | Asphyxia | Occupation not reported |