Inspection: 102835030 - Gainesville Pipeline Contractors, Inc.

Inspection Information - Office: Atlanta East Area Office

 

Inspection Nr: 102835030
Report ID: 0418100
Date Opened: 09/14/1988

Site Address:
Gainesville Pipeline Contractors, Inc.
Wyngate Parkway
Woodstock, GA 30118

Mailing Address:
P.O. Box 2454, Gainesville, GA 30503

Union Status: NonUnion

SIC:1623

NAICS: 0 


Inspection Type: Referral

Scope: Complete

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 09/15/1988

Planning Guide: Safety-Construction

Emphasis:

Case Closed: 01/06/1989


Related Activity
Type Activity Nr Safety Health
Referral 900969551 Yes Yes
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 3 3 6
Current Violations 3 3 6
Initial Penalty $1,920 $0 $0 $0 $0 $1,920
Current Penalty $960 $0 $0 $0 $0 $960
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Serious 5A0001 09/26/1988 09/29/1988 $320 $640 $0 I - Informal Settlement  
2. 01002 Serious 19260020 B01 09/26/1988 10/14/1988 $320 $640 $0 I - Informal Settlement  
3. 01003 Serious 19260021 B06 I 09/26/1988 10/14/1988 $320 $640 $0 I - Informal Settlement  
4. 02001 Other 19030002 A01 09/26/1988 09/29/1988 $0 $0 $0 -  
5. 02002 Other 19040002 A 09/26/1988 10/31/1988 $0 $0 $0 -  
6. 02003 Other 19040005 A 09/26/1988 10/31/1988 $0 $0 $0 -  

Investigation Summary

Investigation Nr: 606756
Event: 09/14/1988
Employee overcome by oxygen deficiency in manhole

Employee #2 went into a 15 ft deep 4 ft diameter sewer manhole to grout around the joints. The manhole was new and had not been connected to an active sewer line. Employee #2 worked near the top of the manhole, then came out because it was too hot. Employee #1 went to the bottom of the manhole to clean it out and was almost immediately in distress. Employees #3 and #2 went into the manhole to rescue him. They tied a rope around Employee #1, pulled him out, and somehow were able to climb out themselves. Employee #1 spent the night in the hospital. Employees #2 and #3 were treated and released from the hospital. The manhole had been installed about 3 months earlier and was just opened a few minutes before work began. About 18 hours after the accident, the oxygen level in the manhole was .7 percent.

Keywords: OXYGEN, CONSTRUCTION, MANHOLE

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 102835030 Non Hospitalized injury Asphyxia Occupation not reported
2 102835030 Hospitalized injury Asphyxia Occupation not reported
3 102835030 Non Hospitalized injury Asphyxia Occupation not reported
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.