Inspection Detail
Inspection: 102331774 - Coastal Refining & Marketing, Inc.
Inspection Information - Office: Corpus Christi Area Office
Site Address:
Coastal Refining & Marketing, Inc.
1300 Cantwell Lane (West Plant)
Corpus Christi, TX 78407
Mailing Address:
P.O.Box 109, Corpus Christi, TX 78403
Union Status: NonUnion
SIC:2911
NAICS: 0
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 05/23/1989
Planning Guide: Safety-Construction
Emphasis:
Case Closed: 05/02/1990
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 360670871 |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 13 | 3 | 16 | |||
| Current Violations | 9 | 3 | 12 | |||
| Initial Penalty | $3,330 | $0 | $0 | $0 | $0 | $3,330 |
| Current Penalty | $1,615 | $0 | $0 | $0 | $0 | $1,615 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001A | Serious | 19100038 A01 | 07/20/1989 | 10/16/1989 | $180 | $360 | $0 | 08/14/1989 | F - Formal Settlement | |
| 2. | 01001B | Serious | 19100038 B01 | 07/20/1989 | 08/16/1989 | $0 | $0 | $0 | 08/14/1989 | F - Formal Settlement | Citation has been deleted. |
| 3. | 01002 | Serious | 19100038 A02 II | 07/20/1989 | 10/16/1989 | $135 | $270 | $0 | 08/14/1989 | F - Formal Settlement | |
| 4. | 01003 | Serious | 19100038 A05 II | 07/20/1989 | 08/16/1989 | $270 | $270 | $0 | 08/14/1989 | - | |
| 5. | 01004 | Serious | 19100038 B05 | 07/20/1989 | 10/16/1989 | $135 | $270 | $0 | 08/14/1989 | F - Formal Settlement | |
| 6. | 01005 | Serious | 19100106 B06 | 07/20/1989 | 10/16/1989 | $400 | $540 | $0 | 08/14/1989 | F - Formal Settlement | |
| 7. | 01006 | Serious | 19100156 C04 | 07/20/1989 | 08/16/1989 | $270 | $270 | $0 | 08/14/1989 | F - Formal Settlement | Citation has been deleted. |
| 8. | 01007 | Serious | 19100156 E01 I | 07/20/1989 | 08/02/1989 | $270 | $270 | $0 | 08/14/1989 | F - Formal Settlement | Citation has been deleted. |
| 9. | 01008 | Serious | 19100156 E01 II | 07/20/1989 | 07/27/1989 | $270 | $270 | $0 | 08/14/1989 | F - Formal Settlement | Citation has been deleted. |
| 10. | 01009 | Serious | 19100156 F01 II | 07/20/1989 | 08/02/1989 | $180 | $180 | $0 | 08/14/1989 | F - Formal Settlement | Citation has been deleted. |
| 11. | 01010 | Serious | 19100165 B03 | 07/20/1989 | 10/16/1989 | $180 | $180 | $0 | 08/14/1989 | F - Formal Settlement | |
| 12. | 01011 | Serious | 19100307 B | 07/20/1989 | 07/27/1989 | $90 | $90 | $0 | 08/14/1989 | - | |
| 13. | 01012 | Serious | 19101200 E01 II | 07/20/1989 | 12/15/1989 | $135 | $270 | $0 | 08/14/1989 | F - Formal Settlement | |
| 14. | 01013 | Serious | 19101200 H02 I | 07/20/1989 | 12/15/1989 | $90 | $90 | $0 | 08/14/1989 | F - Formal Settlement | |
| 15. | 02001 | Other | 19100156 B01 | 07/20/1989 | 10/16/1989 | $0 | $0 | $0 | 08/14/1989 | F - Formal Settlement | |
| 16. | 02002 | Other | 19100158 E02 III | 07/20/1989 | 12/16/1989 | $0 | $0 | $0 | 08/14/1989 | F - Formal Settlement | |
| 17. | 02003 | Other | 19100158 E02 VI | 07/20/1989 | 08/02/1989 | $0 | $0 | $0 | 08/14/1989 | - |
Investigation Summary
At approximately 1:30 p.m. on May 20, 1989, Employee #1 was opening a bleeder valve when propane gas was released from the line. Employees #2 and #4 were insulating a feed drum from a scaffold above the bleeder valve; and, as they attempted to evacuate the area, an explosion and flash fire occurred. Employees #1, #2, and #4 suffered burns and were hospitalized. Employees #5 through #8, members of an emergency response fire fighting company, sustained chemical burns to their lower limbs and hands from an unknown substance in the water on the ground after it seeped into their personal protective equipment. Employees #9 through #13 had been working from a scaffold 19 ft above the ground. In their efforts to escape, they suffered sprains, fractures, and bruises from jumping off the scaffold and running from the area. Employee #1 was under the impression that the line, which was at a pressure of 275 psi, was inactive and that it was ready to be bled down. In all, 13 employees were injured, three of them seriously enough to require hospitalization.
Keywords: LEAK, EXPLOSION, BURN, FLAMMABLE LIQUID, FIRE, WORK RULES, CHEMICAL BURN, PROPANE, FRACTURE, REFINERY
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 102331774 | Hospitalized injury | Burn/Scald(Heat) | Occupation not reported |