Inspection Detail
Inspection: 101881902 - Alabama Power Company Eastern Division
Inspection Information - Office: Birmingham Area Office
Site Address:
Alabama Power Company Eastern Division
W. Of Intersection Eulaton Pike Rd. & Tillman Road
Anniston, AL 35201
Mailing Address:
P. O. Box 129, Anniston, AL 36205
Union Status: Union
SIC:1623
NAICS: 0
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 01/06/1987
Planning Guide: Safety-Construction
Emphasis:
Case Closed: 01/06/1987
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 360537294 |
Investigation Summary
AN EMPLOYEE WAS ATTEMPTING TO REPAIR A DOWNED OVERHEAD POWER LINE. THE EMPLOYEE HAD NOT DETERMINED IF ALL THE LINES WERE DEENERGIZED. HE CONTACTED THE FALLEN LINE, WHICH WAS STILL ENERGIZED, AND WAS ELECTROCUTED.
Keywords: OVERHEAD POWER LINE, ELECTRICAL, POWER LINE WORKER, ELECTROCUTED, LOCKOUT, E PTD, ELEC UTILITY WORK
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 101881902 | Fatality | Electric Shock | Electrical power installers and repairers |
Translate