Inspection Detail
Inspection: 101050953 - Southwest Mississippi Electric Power Association
Inspection Information - Office: Jackson Area Office
Site Address:
Southwest Mississippi Electric Power Association
Hwy. 24 West At Lake Mary Rd.
Woodville, MS 39669
Mailing Address:
Hwy 61 South, Lorman, MS 39096
Union Status: NonUnion
SIC:4911
NAICS: 0
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 01/16/1987
Planning Guide: Safety-Construction
Emphasis:
Case Closed: 06/02/1987
Type | Activity Nr | Safety | Health |
---|---|---|---|
Accident | 360131080 |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 1 | 1 | ||||
Current Violations | 1 | 1 | ||||
Initial Penalty | $350 | $0 | $0 | $0 | $0 | $350 |
Current Penalty | $250 | $0 | $0 | $0 | $0 | $250 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001A | Serious | 19260021 B02 | 02/02/1987 | 04/16/1987 | $250 | $350 | $0 | I - Informal Settlement | ||
2. | 01001B | Serious | 19260950 E01 II | 02/02/1987 | 05/15/1987 | $0 | $0 | $0 | I - Informal Settlement |
Investigation Summary
A TWO-MAN CREW WAS ASSIGNED TO REPAIR A DOWNED 7200-VOLT (PHASE-TO-GROUND) OVERHEAD POWER LINE. THE LINE WAS LYING ON WET BUSHES AND GRASS. THE LINEMAN WAS GOING TO THE NEAREST POLE TO DEENERGIZE THE LINE. AN EYE WITNESS STATED THAT THE LINEMAN WALKED OVER TO THE DOWNED LINE AND PICKED IT UP. HE WAS ELECTROCUTED.
Keywords: OVERHEAD POWER LINE, ELECTRICAL, POWER LINE WORKER, ELECTROCUTED, LOCKOUT, E PTD, ELEC UTILITY WORK
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 101050953 | Fatality | Electric Shock | Electrical power installers and repairers |