Inspection Detail

Inspection: 100782127 - Bush & Burchett Construction Company Inc.

Inspection Information - Office: Charleston Area Office

 

Inspection Nr: 100782127
Report ID: 0316400
Date Opened: 06/20/1991

Site Address:
Bush & Burchett Construction Company Inc.
Route 10 1 Mile North
Hart, WV 25524

Mailing Address:
Post Office Box 320, Allen, KY 41601

Union Status: Union

SIC:1622

NAICS: 0 


Inspection Type: Accident

Scope: Complete

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 09/06/1991

Planning Guide: Safety-Construction

Emphasis:

Case Closed: 11/22/2004


Related Activity
Type Activity Nr Safety Health
Accident 360338743
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 25 10 35
Current Violations 21 5 26
Initial Penalty $44,100 $259,700 $0 $0 $0 $303,800
Current Penalty $34,200 $203,000 $0 $0 $0 $237,200
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Serious 19030002 A01 12/17/1991 12/20/1991 $600 $600 $0 12/31/1991 3 - Supreme Court  
2. 01002A Serious 19260020 B01 12/17/1991 01/02/1992 $3,000 $3,000 $0 12/31/1991 3 - Supreme Court  
3. 01002B Serious 19260020 B02 12/17/1991 01/02/1992 $0 $0 $0 12/31/1991 3 - Supreme Court  
4. 01003 Serious 19260021 B02 12/17/1991 12/20/1991 $3,000 $3,000 $0 12/31/1991 3 - Supreme Court  
5. 01004A Serious 19260050 C 12/17/1991 01/02/1992 $1,200 $1,200 $0 01/03/1992 3 - Supreme Court Citation has been deleted.
6. 01004B Serious 19260050 F 12/17/1991 12/20/1991 $0 $0 $0 01/03/1992 3 - Supreme Court Citation has been deleted.
7. 01005A Serious 19260059 E04 12/17/1991 12/20/1991 $1,200 $1,200 $0 01/03/1992 3 - Supreme Court Citation has been deleted.
8. 01005B Serious 19260059 G10 12/17/1991 12/20/1991 $0 $0 $0 01/03/1992 3 - Supreme Court Citation has been deleted.
9. 01005C Serious 19260059 H 12/17/1991 12/20/1991 $1,200 $0 $0 12/31/1991 3 - Supreme Court  
10. 01006 Serious 19260106 D 12/17/1991 12/20/1991 $1,200 $1,200 $0 12/31/1991 3 - Supreme Court  
11. 01007 Serious 19260251 C05 12/17/1991 12/20/1991 $2,100 $2,100 $0 01/03/1992 3 - Supreme Court Citation has been deleted.
12. 01008 Serious 19260500 D02 12/17/1991 12/20/1991 $2,100 $2,100 $0 12/31/1991 3 - Supreme Court  
13. 01009 Serious 19260550 A01 12/17/1991 12/20/1991 $3,000 $3,000 $0 12/31/1991 3 - Supreme Court  
14. 01010 Serious 19260550 A12 12/17/1991 01/02/1992 $900 $900 $0 12/31/1991 3 - Supreme Court  
15. 01011 Serious 19260550 B02 12/17/1991 12/27/1991 $3,000 $3,000 $0 12/31/1991 3 - Supreme Court  
16. 01012 Serious 19260550 B02 12/17/1991 12/20/1991 $1,200 $1,200 $0 12/31/1991 3 - Supreme Court  
17. 01013 Serious 19260550 B02 12/17/1991 01/02/1992 $2,100 $2,100 $0 12/31/1991 3 - Supreme Court  
18. 01014 Serious 19260550 B02 12/17/1991 12/20/1991 $3,000 $3,000 $0 12/31/1991 3 - Supreme Court  
19. 01015 Serious 19260550 G03II C 12/17/1991 01/02/1992 $0 $3,000 $0 12/31/1991 3 - Supreme Court  
20. 01016 Serious 19260550 G04 IA 12/17/1991 12/20/1991 $2,100 $2,100 $0 01/03/1992 3 - Supreme Court Citation has been deleted.
21. 01017 Serious 19260550 G04II A 12/17/1991 12/20/1991 $2,100 $2,100 $0 12/31/1991 3 - Supreme Court  
22. 01018 Serious 19260550 G04II B 12/17/1991 12/20/1991 $900 $900 $0 12/31/1991 3 - Supreme Court  
23. 01019 Serious 19260550 G04II I 12/17/1991 12/20/1991 $900 $900 $0 12/31/1991 3 - Supreme Court  
24. 01020 Serious 19260550 G04IV D 12/17/1991 12/20/1991 $1,200 $1,200 $0 12/31/1991 3 - Supreme Court  
25. 01021 Serious 19260550 G05I 12/17/1991 12/20/1991 $1,200 $1,200 $0 12/31/1991 3 - Supreme Court  
26. 01022 Serious 19260550 G08I 12/17/1991 12/20/1991 $1,200 $1,200 $0 12/31/1991 3 - Supreme Court  
27. 01023 Serious 19261053 A01II 12/17/1991 12/20/1991 $1,200 $1,200 $0 12/31/1991 3 - Supreme Court  
28. 01024 Serious 19261053 A03I 12/17/1991 12/20/1991 $1,200 $1,200 $0 12/31/1991 3 - Supreme Court  
29. 01025 Serious 19260550 B02 12/17/1991 12/20/1991 $1,500 $1,500 $0 01/03/1992 3 - Supreme Court Citation has been deleted.
30. 02001 Willful 19260105 A 12/17/1991 12/20/1991 $21,000 $21,000 $0 12/31/1991 3 - Supreme Court  
31. 02002 Willful 19260550 B02 12/17/1991 12/27/1991 $21,000 $21,000 $0 12/31/1991 3 - Supreme Court  
32. 02003 Willful 19260550 B02 12/17/1991 12/20/1991 $70,000 $70,000 $0 12/31/1991 3 - Supreme Court  
33. 02004 Willful 19260550 B02 12/17/1991 12/21/1991 $70,000 $70,000 $0 12/31/1991 3 - Supreme Court  
34. 02005 Willful 19260550 G03II C 12/17/1991 01/02/1992 $21,000 $21,000 $0 12/31/1991 3 - Supreme Court  
35. 02006 Willful 19260550 G04 IA 12/17/1991 12/20/1991 $14,700 $14,700 $0 01/03/1992 3 - Supreme Court Citation has been deleted.
36. 02007A Willful 19260550 G04 IIA 12/17/1991 12/20/1991 $14,700 $14,700 $0 01/03/1992 3 - Supreme Court Citation has been deleted.
37. 02007B Willful 19260550 G04 IIA 12/17/1991 12/20/1991 $0 $0 $0 01/03/1992 3 - Supreme Court Citation has been deleted.
38. 02008 Willful 19260550 G04 IIB 12/17/1991 12/20/1991 $6,300 $6,300 $0 01/03/1992 3 - Supreme Court Citation has been deleted.
39. 02009 Willful 19260550 G04 IVD 12/17/1991 12/20/1991 $14,700 $14,700 $0 01/03/1992 3 - Supreme Court Citation has been deleted.
40. 02010 Willful 19260550 G04 III 12/17/1991 12/20/1991 $6,300 $6,300 $0 01/03/1992 3 - Supreme Court Citation has been deleted.

Investigation Summary

Investigation Nr: 14232540
Event: 06/19/1991
Employee killed when struck by collapsing crane boom

Using 80 and 100 ton Link-Belt cranes, the employer was attempting to place a 110 ft long, 108,800 lb concrete beam on top of two piers that were 65 and 70 ft high. Two employees were on top of each pier helping to guide the beam into place. The 80 ton crane was at the east pier and the 100 ton crane was at the west pier. As the beam was being moved, the 80 ton crane became light in the rear. A backhoe bucket was placed on the crane's counterweight to stabilize it. As the 80 ton crane began to boom the beam south, the beam was pulled toward the 80 ton crane. This caused the rear of the 100 ton crane to lift up. At the same time, the operator of the 100 ton crane boomed up and pulled the beam toward the 100 ton crane. This increased the load factor on the 80 ton crane, causing it to tip, strike the pier, and drop the load. As a result, the 100 ton crane boom collapsed and fell onto Employees #1 and #2, killing them.

Keywords: COLLAPSE, CRANE BOOM, CONSTRUCTION, CRUSHED, STRUCK BY, UNSTABLE LOAD

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 100782127 Fatality Other Occupation not reported
2 100782127 Fatality Other Occupation not reported
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.