Inspection: 100739028 - Chevron Usa, Inc.

Inspection Information - Office: Houston North Area Office

 

Inspection Nr: 100739028
Report ID: 0626600
Date Opened: 12/10/1986

Site Address:
Chevron Usa, Inc.
West End Of 7th St.
Port Arthur, TX 77640

Mailing Address:
P.O. Box 701, Port Arthur, TX 77640

Union Status: Union

SIC:2911

NAICS: 0 


Inspection Type: Accident

Scope: Partial

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 01/07/1987

Planning Guide: Safety-Manufacturing

Emphasis:

Case Closed: 07/16/1987


Related Activity
Type Activity Nr Safety Health
Accident 360693642
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations
Initial Penalty $810 $0 $0 $0 $0 $810
Current Penalty $0 $0 $0 $0 $0 $0
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Serious 5A0001 04/23/1987 05/04/1987 $810 $810 $0 A - Amendment Citation has been deleted.

Investigation Summary

Investigation Nr: 14412878
Event: 10/31/1986
Employee killed when reactor heater explodes

At 6:00 a.m. on August 31, 1986, Employee #1, the chief operator of unit #1944, arrived at work. At the start of the shift, all employees were informed that the day would be spent sweeping the reactor (circulating hot hydrogen through the system). They were instructed to maintain the sweeping process and to keep the hydrogen temperature near 400 degrees F. At approximately 12:00 noon the pressure began to build up in the system, and at about 1:00 p.m. the control board operator received an alarm that the pressure indicating control for unit #139 was high. The control was set for 50 lb, but was showing 80 lb. The controller informed the second operator about the condition. The second operator went over to D-11, reset the pressure, and looked inside the heater before calling the controller to inform her that the fire in the heater looked fine. About 45 minutes later, the temperature indicating control for unit #168 showed a drop of approximately 30 degrees F. The controller alerted the second operator that the temperature was dropping and that the gas valves were opening in an attempt to bring the temperature back up. By this time the valves on the temperature indicating control for units #168 and #147 were about 75 to 85 percent open, but their temperature readings were still dropping. The controller also told the second operator that two coworkers had reported smoke coming out of the stack. The control operator then began to cut back on the temperature, 10 degrees at a time, trying to close the valves and put less gas into the heater. Before the valves could be closed, however, a heater exploded. Employee #1, who was at the heater checking out the problem, received second- and third-degree burns over 50 percent of his body. He died on December 7, 1986.

Keywords: BURN, REACTOR, FIRE, EXPLOSION, HIGH PRESSURE, HIGH TEMPERATURE

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 100739028 Fatality Burn/Scald(Heat) Occupation not reported
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.