- Part Number:1926
- Part Number Title:Safety and Health Regulations for Construction
- Subpart:1926 Subpart CC
- Subpart Title:Cranes and Derricks in Construction
- Standard Number:
- Title:Signals--hand signal chart.
- GPO Source:
Hand signal charts must be either posted on the equipment or conspicuously posted in the vicinity of the hoisting operations.
[75 FR 48153, August 9, 2010]