1 - 1926.405(j)(1)(i) - Can energized electrical outlets and switches be taped when rooms are painted
2 - 1926.405(g)(2)(iii) - Whether an employer can repair an extension cord under 29 CFR 1926, Subpart K.
3 - 1926.405, 1926.405(g)(2)(iii) - Whether an employer can repair an extension cord under 29 CFR 1926, Subpart K.
4 - 1926.405(j)(1)(i) - Protection of employees from exposure to live electrical parts with plastic switch plates/receptacle cover and non-conductive screws.
5 - 1926.405(a)(2) - Maximum allowable distance between supports for temporary electrical wiring.
6 - 1926.405 - Minimum distance between supports for temporary electrical wiring.
7 - 1926.405(a)(2)(ii)(J) - Compliance of type SJTW flexible cords with 1926.405(a)(2)(ii)(J) and use on construction sites.
8 - 1926.405, 1926.405(a)(2)(ii)(J) - Compliance of type SJTW flexible cords with 1926.405(a)(2)(ii)(J) and use on construction sites.
9 - 1926.405 - Relevance of NFPA 70E industry consensus standard to OSHA requirements; whether OSHA requirements apply to owners.
10 - 1926.405(g)(2)(iii) - Repair requirements for the cord plug (attachment plug) of double-insulated tools.
11 - 1926.405(g)(1)(iii)(B) - Acceptable uses of flexible temporary cords/cables on construction sites.
12 - 1926.405(g)(1)(iii) - Acceptable uses of flexible temporary cords/cables on construction sites.
13 - 1926.405(g) - Acceptable uses of flexible temporary cords/cables on construction sites.
14 - 1926.405(g)(1)(i)(H) - Acceptable uses of flexible temporary cords/cables on construction sites.
15 - 1926.405(g)(1)(i)(G) - Acceptable uses of flexible temporary cords/cables on construction sites.
16 - 1926.405(g)(1)(i)(F) - Acceptable uses of flexible temporary cords/cables on construction sites.
17 - 1926.405(g)(1)(i)(E) - Acceptable uses of flexible temporary cords/cables on construction sites.
18 - 1926.405(g)(1)(i)(D) - Acceptable uses of flexible temporary cords/cables on construction sites.
19 - 1926.405(g)(1)(i)(C) - Acceptable uses of flexible temporary cords/cables on construction sites.
20 - 1926.405(g)(1)(i)(B) - Acceptable uses of flexible temporary cords/cables on construction sites.
21 - 1926.405(g)(1)(i)(A) - Acceptable uses of flexible temporary cords/cables on construction sites.
22 - 1926.405(g)(1)(i) - Acceptable uses of flexible temporary cords/cables on construction sites.
23 - 1926.405, 1926.405(g), 1926.405(g)(1)(iii), 1926.405(g)(1)(iii)(B), 1926.405(g)(1)(i), 1926.405(g)(1)(i)(A), 1926.405(g)(1)(i)(B), 1926.405(g)(1)(i)(C), 1926.405(g)(1)(i)(D), 1926.405(g)(1)(i)(E), 1926.405(g)(1)(i)(F), 1926.405(g)(1)(i)(G), 1926.405(g)(1)(i)(H) - Acceptable uses of flexible temporary cords/cables on construction sites.
24 - 1926.405(j)(1)(i) - Electrical standard requirements concerning covers for electrical pull boxes, junction boxes, and fittings.
25 - 1926.405(b)(3)(ii) - Electrical standard requirements concerning covers for electrical pull boxes, junction boxes, and fittings.
26 - 1926.405(b)(3) - Electrical standard requirements concerning covers for electrical pull boxes, junction boxes, and fittings.
27 - 1926.405(b)(2) - Electrical standard requirements concerning covers for electrical pull boxes, junction boxes, and fittings.
28 - 1926.405, 1926.405(b)(2), 1926.405(b)(3), 1926.405(b)(3)(ii), 1926.405(j)(1)(i) - Electrical standard requirements concerning covers for electrical pull boxes, junction boxes, and fittings.
29 - 1926.405(d) - Flexible corrugated plastic covers for temporary use to cover live electric parts in switch and panel boxes.
30 - 1926.405(a)(2)(ii)(B) - Use of compressed air above 30 p.s.i. for cleaning purposes;nonmetallic-sheathed cable for temporary wiring.
31 - 1926.405(a)(2) - Use of compressed air above 30 p.s.i. for cleaning purposes;nonmetallic-sheathed cable for temporary wiring.
32 - 1926.405(g)(2)(iii) - Using electrical tape to repair minor damage to the outer jacket of an extension cord.
33 - 1926.405(g) - Use of flexible cords for connection of appliances; scaffold base plates.
34 - 1926.405 - Interpretation of the OSHA construction standards for electrical branch circuits.
35 - 1926.405 - Portable electric lighting.
36 - 1926.405(g)(2)(v) - Acceptable job-made extension cords.
37 - 1926.405(g)(2)(iv) - Acceptable job-made extension cords.
38 - 1926.405(g)(2) - Acceptable job-made extension cords.
39 - 1926.405(g)(2)(v) - Contractor shop-made extension cords.
40 - 1926.405(a)(2)(ii)(I) - Protection of flexible cords when hung in tunnel shafts.
41 - 1926.405 - Temporary lighting branch circuits.
42 - 1926.405 - Acceptability of heat shrinkable insulating covers in making splices.
43 - 1926.405(a)(2)(ii)(J) - Temporary lighting strings used on construction sites.
44 - 1926.405(a)(2)(ii)(G) - Clarification of temporary vs. portable lighting.