1
|
- 1926.251 - Clarification on rigging for hoisting multiple bundles of construction materials
|
2
|
- 1926.251 - Proof testing of lifting beams used to lift wind turbine components.
|
3
|
- 1926.251 - Padded slings/wire rope during steel erection.
|
4
|
- 1926.251 - Testing requirements for "lifting blinds" or "lifting covers" on pressure vessels.
|
5
|
- 1926.251 - Requirements for load-testing and marking of special custom-design rigging accessories; applicability of ASME standards.
|
6
|
- 1926.251 - Marking and proof-testing requirements for special custom-designed lifting accessories.
|
7
|
- 1926.251 - Retesting of reassembled lifting accessories if original manufacturing controls are ensured; retesting requirement if repair/replacement of parts due to breakage, damage, or evidence of diminished capacity.
|
8
|
- 1926.251 - Use of synthetic fiber slings.
|
9
|
- 1926.251 - Rigging equipment for material handling.
|
10
|
- 1926.251 - Cage, skip and load connections to hoist ropes.
|
11
|
- 1926.251 - Modified approach to lifting several steal beams at one time.
|
12
|
- 1926.251 - OSHA Requirements Addressing Fall Protection Equipment
|
13
|
- 1926.251 - Wire rope were used as a bull wire
|