TEXT VERSION OF SLIDE:

  • Title: Otros Métodos de Trabajo
  • Type: Text and Image Slide
  • Content:

Aquí está el mismo sistema aún en su lugar durante la instalación del MEP y tabla de yeso. La preparación y pintura se puede hacer antes de instalar el pasamanos permanentes y de eliminar la baranda.

[Includes image of a properly installed guard/hand rail using a "safety boot" system. The walls around the guard/hand rail have dry wall and are ready for priming and painting.]

Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close