Slide 58

TEXT VERSION OF SLIDE:

    Title: Other Work Methods
    Type: Text and Image Slide
    Content:

    Here is the same system still in place through MEP installation and dry wall. Priming and painting can be done before installing the permanent handrail and removing the guardrail.

    At the bottom left is slide number 58.

    At the bottom right is OSHA's logo.

    [Includes image of a properly installed guard/hand rail using a "safety boot" system. The walls around the guard/hand rail have dry wall and are ready for priming and painting.]

    Speaker Notes:

    Here is the same system still in place through Mechanical, Electrical, Plumbing installation and dry wall.

    Priming and painting can be done before installing the permanent handrail and removal of the guardrail.