Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 996555.015
Citation: 01004
Citation Type: Serious
Abatement Date: 05/06/2016 2
Initial Penalty: $7,000.00
Current Penalty: $6,300.00
Issuance Date: 03/20/2015
Nr Instances: 1
Nr Exposed: 10
Related Event Code (REC):
Gravity: 10
Report ID: 0418300
Contest Date: 04/10/2015
Final Order: 04/22/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 04/22/2016 | $6,300.00 | 05/06/2016 | Serious | |
Penalty | C: Contested | 04/13/2015 | $7,000.00 | 04/08/2015 | Serious | |
Penalty | Z: Issued | 03/20/2015 | $7,000.00 | 04/08/2015 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: (a) On or about 9/22/14 - at the Flux Building for "X" & "U" furnaces, the "Changing Claudius Peter Valve Cassette" SJP procedure number QBMA0094 with review date 5/15/2012 had not been reviewed at least annually.