Violation Detail
Standard Cited: 19100146 D05 II Permit-required confined spaces
Inspection Nr: 996298.015
Citation: 02002G
Citation Type: Willful
Abatement Date: 03/20/2015 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/03/2015
Nr Instances: 2
Nr Exposed: 2
Related Event Code (REC): R
Gravity: 5
Report ID: 0524500
Contest Date: 04/07/2015
Final Order: 02/04/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/04/2016 | $0.00 | 03/20/2015 | Willful | |
Penalty | C: Contested | 04/09/2015 | $0.00 | 03/20/2015 | Willful | |
Penalty | Z: Issued | 03/03/2015 | $0.00 | 03/20/2015 | Willful |
Text For Citation: 02 Item/Group: 002G Hazard:
29 CFR 1910.146(d)(5)(ii): Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not evaluate permit space conditions when entry operations were conducted by testing or monitoring the permit space as necessary: The employer did not perform atmospheric testing and monitoring to evaluate of conditions remained acceptable during employee entry into the Cyclone chamber and airlock (permit-required confined spaces) in order to perform cleaning and maintenance tasks.