Standard Cited: 19101200 H01 Hazard Communication.
Inspection Nr: 984505.015
Citation: 02008
Citation Type: Repeat
Abatement Date: 02/24/2015 4
Initial Penalty: $4,620.00
Current Penalty: $4,030.76
Issuance Date: 01/06/2015
Nr Instances: 1
Nr Exposed: 8
Related Event Code (REC):
Gravity: 1
Report ID: 0112000
Contest Date: 07/06/2020
Final Order: 07/06/2020
Emphasis:
Failure to Abate | |||||||
---|---|---|---|---|---|---|---|
Activity Nr | Issuance | Penalty | Contest | Final Order | |||
1161632 | 05/09/2016 | $4,030.76 | 07/06/2020 | 07/06/2020 |
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
FTA | C: Contested | 07/30/2020 | $36,000.00 | 06/24/2016 | 1161632.015 | |
Penalty | C: Contested | 07/30/2020 | $4,620.00 | 02/24/2015 | Repeat | |
FTA | F: Formal Settlement | 07/06/2020 | $4,030.76 | 06/24/2016 | 1161632.015 | |
Penalty | F: Formal Settlement | 07/06/2020 | $4,030.76 | 02/24/2015 | Repeat | |
FTA | Z: Issued | 05/09/2016 | $36,000.00 | 06/24/2016 | 1161632.015 | |
Penalty | Z: Issued | 01/06/2015 | $4,620.00 | 02/24/2015 | Repeat |
Text For Citation: 02 Item/Group: 008 Hazard:
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area: COMPANY-WIDE: On or about July 10, 2014, the employer did not ensure that employees were formally trained in the physical and health hazards associated with the job tasks that they were responsible for including, but not limited to, welding on galvanized and/or stainless steel as well as using flammable paints and solvents. The company was previously cited for a violation of the Occupational Safety and Health Standard which was contained in inspection number 311763981, citation number 1, item 10, issued on November 4, 2009, with respect to a workplace located at 607 Bantam Road, Bantam, CT. The final order date was December 15, 2009.