Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 941314.015
Citation: 01024A
Citation Type: Serious
Abatement Date: 04/02/2014 2
Initial Penalty: $6,600.00
Current Penalty: $4,350.00
Issuance Date: 03/07/2014
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 03/27/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/27/2014 | $4,350.00 | 04/02/2014 | Serious | |
Penalty | Z: Issued | 03/07/2014 | $6,600.00 | 04/02/2014 | Serious |
Text For Citation: 01 Item/Group: 024A Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure. On or about 9/11/13, at 1 Lemon Lane, Atlanta, outside the refrigeration office, the water fountain was powered with a temporary electrical extension cord in lieu of fixed wiring. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).