Violation Detail
Standard Cited: 19100119 D03 I B Process safety management of highly hazardous chemicals.
Inspection Nr: 941314.015
Citation: 01007
Citation Type: Serious
Abatement Date: 06/02/2014 2
Initial Penalty: $5,500.00
Current Penalty: $3,500.00
Issuance Date: 03/07/2014
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC):
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 03/27/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/27/2014 | $3,500.00 | 06/02/2014 | Serious | |
Penalty | Z: Issued | 03/07/2014 | $5,500.00 | 04/23/2014 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.119(d)(3)(i)(B): The employer's piping and instrument diagrams were not accurate and did not represent equipment that was existing and was part of the process. On or about 9/11/13, at the 1 Lemon Lane, Atlanta Ga facility, the employer's piping and instrument diagrams were not accurrate. PID 07 has four relief valves on condenser piping that are not installed on the system. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).