Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 930427.015
Citation: 01004
Citation Type: Serious
Abatement Date: 01/07/2014 2
Initial Penalty: $2,380.00
Current Penalty: $1,666.00
Issuance Date: 11/18/2013
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0336000
Contest Date:
Final Order: 12/10/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/10/2013 | $1,666.00 | 01/07/2014 | Serious | |
Penalty | Z: Issued | 11/18/2013 | $2,380.00 | 01/07/2014 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in lockout tagout activities covered by this section: (a) Papco Inc., Warren Fractionation Plant, 14888 Route 6, Clarendon, PA 16313: On or about August 14, 2013, and at times prior thereto, employees periodically performed servicing, maintenance and repairs to process equipment that included, but was not limited to, compressors and pumps.