Violation Detail
Standard Cited: 19100119 F01 I D Process safety management of highly hazardous chemicals.
Inspection Nr: 930427.015
Citation: 01001
Citation Type: Serious
Abatement Date: 01/07/2014 2
Initial Penalty: $2,975.00
Current Penalty: $2,082.50
Issuance Date: 11/18/2013
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0336000
Contest Date:
Final Order: 12/10/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/10/2013 | $2,082.50 | 01/07/2014 | Serious | |
Penalty | Z: Issued | 11/18/2013 | $2,975.00 | 01/07/2014 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.119(f)(1)(i)(D): The employer did not develop and implement written operating procedures that provide clear instructions for emergency shutdown, including the conditions under which emergency shutdown is required, and the assignment of shutdown responsibility to qualified operators to ensure that emergency shutdown is executed in a safe and timely manner: a.) Papco Inc., Warren Fractionation Plant, 14888 Route 6, Clarendon, PA 16313: On or about August 14, 2013, and at times prior thereto, Emergency shutdown procedures for fractionantion plant process equipment had not been written and implemented.