Violation Detail
Standard Cited: 19100304 G05 Wiring design and protection.
Inspection Nr: 890866.015
Citation: 01001
Citation Type: Other
Abatement Date: 06/07/2013 2
Initial Penalty: $6,600.00
Current Penalty: $3,300.00
Issuance Date: 05/01/2013
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity:
Report ID: 0627510
Contest Date:
Final Order: 05/28/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/28/2013 | $3,300.00 | 06/07/2013 | Other | |
Penalty | Z: Issued | 05/01/2013 | $6,600.00 | 05/28/2013 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.304(g)(5): Grounding path. The path to ground from circuits, equipment, and enclosures shall be permanent, continuous, and effective. On or about February 14, 2013, the high pressure washer located next to the mud pumps at Helmerich and Payne Inc. Drilling Rig #347 site was not grounded, exposing employees to electrical hazards.