Violation Detail
Standard Cited: 19100305 G01 IV D Wiring methods, components, and equipment for general use.
Inspection Nr: 879483.015
Citation: 01011C
Citation Type: Serious
Abatement Date: 08/15/2013 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/25/2013
Nr Instances: 2
Nr Exposed: 9
Related Event Code (REC):
Gravity: 5
Report ID: 0830100
Contest Date: 08/13/2013
Final Order: 04/18/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/18/2014 | $0.00 | 08/15/2013 | Serious | |
Penalty | C: Contested | 08/15/2013 | $0.00 | 08/15/2013 | Serious | |
Penalty | Z: Issued | 07/25/2013 | $0.00 | 08/15/2013 | Serious |
Text For Citation: 01 Item/Group: 011C Hazard:
29 CFR 1910.305(g)(1)(iv)(D): Flexible cords and cables were used where attached to building surfaces: (a) Centrifuge Floor: On or about January 29, 2013 and times prior thereto, employees were exposed to electric shock by using a 120 volt extension cord attached to building surfaces. (b) Rail Loading Platform: On or about January 29, 2013 and times prior thereto, employees were exposed electric shock by using a 120 volt extension cord attached to building surfaces.