Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 804981.015
Citation: 01001
Citation Type: Serious
Abatement Date: 07/11/2013 2
Initial Penalty: $7,000.00
Current Penalty: $0.00
Issuance Date: 06/28/2013
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0317000
Contest Date: 07/25/2013
Final Order: 05/05/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 05/05/2014 | $0.00 | 07/11/2013 | Serious | |
Penalty | C: Contested | 07/25/2013 | $7,000.00 | 07/11/2013 | Serious | |
Penalty | Z: Issued | 06/28/2013 | $7,000.00 | 07/11/2013 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(ii): Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C) and (c)(4)(ii)(D): a) Jobsite: 777 Harrah's Boulevard, Chester PA, Cove Restaurant - Schindler Elevator Corporation did not develop, document, and utilize clear and specific procedures for the control of hazardous energy associated with Atlas dumbwaiters #29 and #30. Noted on or about 12/29/12.