Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 767103.015
Citation: 01002
Citation Type: Serious
Abatement Date: 05/30/2013 3
Initial Penalty: $3,500.00
Current Penalty: $3,500.00
Issuance Date: 05/30/2013
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0213600
Contest Date: 06/13/2013
Final Order: 03/23/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | 2: Appeals Court | 03/23/2017 | $3,500.00 | 05/30/2013 | Serious | |
Penalty | C: Contested | 06/17/2013 | $3,500.00 | 05/30/2013 | Serious | |
Penalty | Z: Issued | 05/30/2013 | $3,500.00 | 05/30/2013 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: a) On or about 12/4/12 in Warehouse D; the south east metal exit door was welded shut and missing a handle. No Abatement Certification Required