Violation Detail
Standard Cited: 19100147 D06 The control of hazardous energy (lockout/tagout).
Inspection Nr: 438832.015
Citation: 01004
Citation Type: Serious
Abatement Date: 11/28/2012 2
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 11/07/2012
Nr Instances:
Nr Exposed: 9
Related Event Code (REC):
Gravity: 10
Report ID: 0627510
Contest Date: 11/29/2012
Final Order: 04/21/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 04/21/2014 | $7,000.00 | 11/28/2012 | Serious | |
Penalty | C: Contested | 11/30/2012 | $7,000.00 | 11/28/2012 | Serious | |
Penalty | Z: Issued | 11/07/2012 | $7,000.00 | 11/28/2012 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.147(d)(6): Prior to starting work on equipment that has been locked out, the authorized employee did not verify that isolation and deenergization of the equipment had been accomplished. On or about June 1, 2012, the employer did not confirm that the employee adequately verified the isolation of the 10 inch settler effluent line to ensure so far as possible that all sulfuric acid had been removed.