Violation Detail
Standard Cited: 19100107 I08 Spray finishing using flammable and combustible materials.
Inspection Nr: 432712.015
Citation: 01001B
Citation Type: Other
Abatement Date: 10/26/2012 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/26/2012
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): C
Gravity:
Report ID: 0336000
Contest Date:
Final Order: 10/19/2012
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/19/2012 | $0.00 | 10/26/2012 | Other | |
Penalty | Z: Issued | 09/26/2012 | $0.00 | 10/26/2012 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.107(i)(8): ): Electrical equipment for electrostatic hand spraying was not so interlocked with the ventilation of the spraying area(s) that the equipment cannot be operated unless the ventilation fan(s) are in operation: a.) Building 7, Powder Coating - Company employee conducted powder coating operations in the Company's powder coating booth throughout each workshift. On or about, and dates prior to, August 10, 2012, electrostatic hand-held spray guns were operable when the ventilation fans were not in operation.