Violation Detail
Standard Cited: 19100147 C06 IA The control of hazardous energy (lockout/tagout).
Inspection Nr: 313026163
Citation: 01018A
Citation Type: Serious
Abatement Date: 01/19/2010 X
Initial Penalty: $2,500.00
Current Penalty: $2,500.00
Issuance Date: 12/29/2009
Nr Instances: 1
Nr Exposed: 25
Related Event Code (REC):
Gravity: 03
Report ID: 0625700
Contest Date:
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/21/2010 | $2,500.00 | 01/19/2010 | Serious | |
Penalty | Z: Issued | 12/29/2009 | $2,500.00 | 01/19/2010 | Serious |
Text For Citation: 01 Item/Group: 018A Hazard: REFINERY
29 CFR 1910.147(c)(6)(i) (A): The periodic inspection of the energy control procedure was not performed by an authorized employee other than the one utilizing the energy control procedure being inspected: This violation was observed on or about September 16, 2009, where the employer failed to ensure that the periodic review of specific procedures for the control of hazardous energy included two authorized employees. Currently, the review is conducted by the area supervisor and annotated electronically. This condition exposed employees to struck by and electrical hazards. Pursuant to 29 CFR 1903.19(d), within 10 calendar days of the date of the citation, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps it is taking to ensure that all of the specific procedures are reviewed in the manner outlined in the standard.