Violation Detail
Standard Cited: 19100119 E01 Process safety management of highly hazardous chemicals.
Inspection Nr: 313026163
Citation: 01004A
Citation Type: Serious
Abatement Date: 01/19/2010 X
Initial Penalty: $5,000.00
Current Penalty: $5,000.00
Issuance Date: 12/29/2009
Nr Instances: 2
Nr Exposed: 200
Related Event Code (REC):
Gravity: 10
Report ID: 0625700
Contest Date:
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/21/2010 | $5,000.00 | 01/19/2010 | Serious | |
Penalty | Z: Issued | 12/29/2009 | $5,000.00 | 01/19/2010 | Serious |
Text For Citation: 01 Item/Group: 004A Hazard: REFINERY
29 CFR 1919.119(e)(1): The employer did not identify, evaluate or control the hazard of the process. a) This violation was observed on or about July 8, 2009, where the employer failed to address in its PHA the hazard posed by intervening valves on the upstream and downstream lines to/from relief devices that could be closed during operation rendering the relief device(s) inoperable. This condition exposed employees to fire and explosion hazards. Pursuant to 1903.19(d), within 10 calendar days of the date of the citation, the employer must submit documentation showing that it is compliance with the standard, including describing steps it has taken to ensure that the PHA for the Hydro Cracker addresses the safe operation of relief system devices. b) This violation was observed on or about July 8, 2009, where the employer failed to address in its PHA the hazard posed when the flare system is not in service and there is potential for the relief system to release flammable vapors into both the atmosphere and the employee occupied areas. This condition exposed employees to fire and explosion hazards. Pursuant to 1903.19(d), within 10 calendar days of the date of the citation, the employer must submit documentation showing that it is compliance with the standard, including describing steps it has taken to ensure that the PHA for the Hydro Cracker addresses the potential release to atmosphere.