Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 312922966
Citation: 01011
Citation Type: Serious
Abatement Date: 02/14/2011
Initial Penalty: $6,300.00
Current Penalty:
Issuance Date: 12/29/2010
Nr Instances: 1
Nr Exposed: 54
Related Event Code (REC):
Gravity: 10
Report ID: 0626700
Contest Date: 01/21/2011
Final Order: 01/09/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 01/09/2013 | 02/14/2011 | Serious | ||
Penalty | Z: Issued | 12/29/2010 | $6,300.00 | 02/14/2011 | Serious |
Text For Citation: 01 Item/Group: 011 Hazard: REFINERY
29 CFR 1910.119(j)(2): The employer did not establish and implement written procedures to maintain the on-going mechanical integrity of process equipment: a)The employer failed to establish and implement written procedures to maintain the on- going mechanical integrity of process equipment. This violation most recently occurred at the Pasadena Refining Systems Inc. located at 111 Red Bluff Road, Pasadena, Texas on or about June 30, 2010, and at times thereafter, for on stream leak repairs (to provide detailed guidance in evaluating, selecting, and monitoring on stream leak repairs), exposing employees to potential fire and explosion hazards. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure to establish and implement written procedures to maintain the on-going mechanical integrity of process equipment.