Standard Cited: 19100119 J05 Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 311611081
Citation: 02026B
Citation Type: Willful
Abatement Date: 04/19/2010
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/08/2010
Nr Instances: 1
Nr Exposed: 25
Related Event Code (REC):
Gravity: 10
Report ID: 0524700
Contest Date: 03/31/2010
Final Order: 09/27/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | R: Review Commission | 09/27/2018 | $0.00 | Willful | ||
Penalty | Z: Issued | 03/08/2010 | $0.00 | Willful |
Text For Citation: 02 Item/Group: 026B Hazard: REFINERY
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment t hat are outside acceptable limits (as defined by process information in 29 CFR 1910.119( d) before further use or in a safe and timely manner: a.BP-Husky Refining, LLC - Oregon, Ohio: The employer does not address the need for over pressure protecti on on pressure vessels. The Steam Slurry Generator (PR543565) is not protected b y pressure relieving devices that would prevent the pressure inside the vessel f rom rising above acceptable limits. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer mu st submit an abatement plan describing the actions it is taking to ensure that i t is in compliance with the standards for all pressure vessels, including docume nting that each pressure vessel has been evaluated and is protected by pressure- relieving device(s) in accordance with recognized and generally accepted good en gineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates d uring the next three months when the evaluations and installations of overpressu re protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.